Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas

Name of this project is renovation work for Syarikat Air Johor (SAJ) meter. This project was located at Taman Air Biru Zone A, was handle by Mr. Mohd Norhafizi bin Musa. This project involves 5 unit flats. Each of the flats contain 32 lots of houses. The main contractor for this project is E man Uta...

Full description

Saved in:
Bibliographic Details
Main Author: Abas, Alifah
Format: Student Project
Language:English
Published: 2017
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/57188/1/57188.pdf
https://ir.uitm.edu.my/id/eprint/57188/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.57188
record_format eprints
spelling my.uitm.ir.571882022-03-25T08:37:53Z https://ir.uitm.edu.my/id/eprint/57188/ Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas Abas, Alifah TH Building construction Maintenance and repair Plumbing and pipefitting Name of this project is renovation work for Syarikat Air Johor (SAJ) meter. This project was located at Taman Air Biru Zone A, was handle by Mr. Mohd Norhafizi bin Musa. This project involves 5 unit flats. Each of the flats contain 32 lots of houses. The main contractor for this project is E man Utama sdn bhd. This project started on 15 January 2017 until 23 February 2017. This project involves changes in water distribution system and the location of the Syarikat Air Johor (SAJ) meter. It changed the distribution system from indirect system to direct system. This project used 5 manpower. This project used various of tools, such as axes for excavation, power drill, breaker machine, handsaw used to make a mould and other tools. It also used many types of material or component. For example, they used three types of Elbow connector, which is elbow connector size ¾”, 2”x3/4” and ¾”x ½”, 24 units of tee connector, 32 sets of meter union, 32 units of stop cock and other component that always used in plumbing. In this project there have 6 types of operations. First, underground poly pipe installation. Second, HDPE piping installation, where they install pipe size 63mm. Third, water meter stand, this process is about installing the stand meter for individual meter. Next, poly pipe installation for 1st floor and above. Next is water pressure test. This process is to know the pressure either enough for whole building or not. Lastly, backfilling and wall groove filling, where they build a wall to prevent a smashing to the stand meter. The common problem occurred in plumbing is low pressure of water. Usually, this problem occurred because of the pipe is clogged or there has a leaking. So as to prevent this problem, the pipe will be repair and remove the pipe clogged. 2017 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/57188/1/57188.pdf (2017) Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas. [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Maintenance and repair
Plumbing and pipefitting
spellingShingle TH Building construction
Maintenance and repair
Plumbing and pipefitting
Abas, Alifah
Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas
description Name of this project is renovation work for Syarikat Air Johor (SAJ) meter. This project was located at Taman Air Biru Zone A, was handle by Mr. Mohd Norhafizi bin Musa. This project involves 5 unit flats. Each of the flats contain 32 lots of houses. The main contractor for this project is E man Utama sdn bhd. This project started on 15 January 2017 until 23 February 2017. This project involves changes in water distribution system and the location of the Syarikat Air Johor (SAJ) meter. It changed the distribution system from indirect system to direct system. This project used 5 manpower. This project used various of tools, such as axes for excavation, power drill, breaker machine, handsaw used to make a mould and other tools. It also used many types of material or component. For example, they used three types of Elbow connector, which is elbow connector size ¾”, 2”x3/4” and ¾”x ½”, 24 units of tee connector, 32 sets of meter union, 32 units of stop cock and other component that always used in plumbing. In this project there have 6 types of operations. First, underground poly pipe installation. Second, HDPE piping installation, where they install pipe size 63mm. Third, water meter stand, this process is about installing the stand meter for individual meter. Next, poly pipe installation for 1st floor and above. Next is water pressure test. This process is to know the pressure either enough for whole building or not. Lastly, backfilling and wall groove filling, where they build a wall to prevent a smashing to the stand meter. The common problem occurred in plumbing is low pressure of water. Usually, this problem occurred because of the pipe is clogged or there has a leaking. So as to prevent this problem, the pipe will be repair and remove the pipe clogged.
format Student Project
author Abas, Alifah
author_facet Abas, Alifah
author_sort Abas, Alifah
title Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas
title_short Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas
title_full Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas
title_fullStr Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas
title_full_unstemmed Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas
title_sort reinstallation of water supply system (service provider for low-rise building) / alifah abas
publishDate 2017
url https://ir.uitm.edu.my/id/eprint/57188/1/57188.pdf
https://ir.uitm.edu.my/id/eprint/57188/
_version_ 1729707541387018240