Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi

Construction industry is one of the main industries in this country. The industry helps to generate the nation’s economy as well as proving benefits to construction companies. But some of these firm acted unprofessionally by involving in project that do not meet the standart especially in housing de...

Full description

Saved in:
Bibliographic Details
Main Author: Mior Alhadi, Mior Ahmad Ridzuan
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/62903/1/62903.pdf
https://ir.uitm.edu.my/id/eprint/62903/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.62903
record_format eprints
spelling my.uitm.ir.629032022-08-09T01:41:18Z https://ir.uitm.edu.my/id/eprint/62903/ Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi Mior Alhadi, Mior Ahmad Ridzuan TH Building construction Buildings: Construction with reference to use.Including public buildings, dwellings Construction by phase of the work (Building trades) Construction industry is one of the main industries in this country. The industry helps to generate the nation’s economy as well as proving benefits to construction companies. But some of these firm acted unprofessionally by involving in project that do not meet the standart especially in housing development. There are a lot of defect to the houses purchase by house buyers especially in term of material and workmanship. This study has been conducted in the aim of identifying factors affecting quality of construction and type of defects. The methodology adopted was through literature review and interview the developer and the contractor. The result can show that poor workmanship is the major contributor to poor quality of construction. In order to minimize the problem, the contractor has to provide workers with necessary experience and skills. Generally, this practical training report clarifies the information about all of the repairing works, processes and methods during the building defect liability period (DLP).This practical training report is prepared based on day to day and comprehensive program of repair, renewed maintenance gained throughout about 4 months of practical training on a construction site of a FN Communication Sdn Bhd. This practical training report is started with explanation and clarification of company background and background of project. Also, in this practical training report, the method statement or the work instruction of the repairing work of the building during DLP will be explained thoroughly. Next, this report also explained about the problem caused by the materials used for the construction and the equipment used by the general workers. Moreover, the common problems and defects faced involving during DLP is also explained in this report along with its suitable steps of solutions. As the conclusion, this practical training report can explain in details about the repairing process during DLP in practically to all of the readers. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/62903/1/62903.pdf Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi. (2015) [Student Project]
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Buildings: Construction with reference to use.Including public buildings, dwellings
Construction by phase of the work (Building trades)
spellingShingle TH Building construction
Buildings: Construction with reference to use.Including public buildings, dwellings
Construction by phase of the work (Building trades)
Mior Alhadi, Mior Ahmad Ridzuan
Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi
description Construction industry is one of the main industries in this country. The industry helps to generate the nation’s economy as well as proving benefits to construction companies. But some of these firm acted unprofessionally by involving in project that do not meet the standart especially in housing development. There are a lot of defect to the houses purchase by house buyers especially in term of material and workmanship. This study has been conducted in the aim of identifying factors affecting quality of construction and type of defects. The methodology adopted was through literature review and interview the developer and the contractor. The result can show that poor workmanship is the major contributor to poor quality of construction. In order to minimize the problem, the contractor has to provide workers with necessary experience and skills. Generally, this practical training report clarifies the information about all of the repairing works, processes and methods during the building defect liability period (DLP).This practical training report is prepared based on day to day and comprehensive program of repair, renewed maintenance gained throughout about 4 months of practical training on a construction site of a FN Communication Sdn Bhd. This practical training report is started with explanation and clarification of company background and background of project. Also, in this practical training report, the method statement or the work instruction of the repairing work of the building during DLP will be explained thoroughly. Next, this report also explained about the problem caused by the materials used for the construction and the equipment used by the general workers. Moreover, the common problems and defects faced involving during DLP is also explained in this report along with its suitable steps of solutions. As the conclusion, this practical training report can explain in details about the repairing process during DLP in practically to all of the readers.
format Student Project
author Mior Alhadi, Mior Ahmad Ridzuan
author_facet Mior Alhadi, Mior Ahmad Ridzuan
author_sort Mior Alhadi, Mior Ahmad Ridzuan
title Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi
title_short Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi
title_full Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi
title_fullStr Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi
title_full_unstemmed Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi
title_sort defect repairing work on building during defects liability period (dlp) (rural health clinics kd2g types 1 and 2 for ministry of health malaysia): fn communication sdn. bhd./ mior ahmad ridzuan mior alhadi
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/62903/1/62903.pdf
https://ir.uitm.edu.my/id/eprint/62903/
_version_ 1740829081848512512