The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi
Practical training is a training industry that brings closer about the real nature of construction jobs. Students are allowed to undergo practical training in the goverment sector or the private sector and students are allowed to apply for a place was selected by self. During the 14 weeks of practic...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/62960/1/62960.pdf https://ir.uitm.edu.my/id/eprint/62960/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |
id |
my.uitm.ir.62960 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.629602022-07-01T00:28:04Z https://ir.uitm.edu.my/id/eprint/62960/ The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi Muhamad Suhaimi, Nur Athirah Malaysia Buildings: Construction with reference to use.Including public buildings, dwellings Practical training is a training industry that brings closer about the real nature of construction jobs. Students are allowed to undergo practical training in the goverment sector or the private sector and students are allowed to apply for a place was selected by self. During the 14 weeks of practical training at the project site in place Pejabat Daerah Sik, i have identified several topics of study in accordance with the work done on the construction site. I have chosen the title the process of construction mosque. The real aim of the practical training is to provide an apportunity for students to practice the theory learned in the classroom and used for real work in industries. So students can acquire new knowledge and great experience during this industrial training while it helps the students to get jobs. In conclusion, this is absolutely compulsary industrial training conducted for all students because iy is the best method to exposed students to real working conditions on site. 2015-10 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/62960/1/62960.pdf The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi. (2015) [Student Project] (Unpublished) |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Malaysia Buildings: Construction with reference to use.Including public buildings, dwellings |
spellingShingle |
Malaysia Buildings: Construction with reference to use.Including public buildings, dwellings Muhamad Suhaimi, Nur Athirah The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi |
description |
Practical training is a training industry that brings closer about the real nature of construction jobs. Students are allowed to undergo practical training in the goverment sector or the private sector and students are allowed to apply for a place was selected by self. During the 14 weeks of practical training at the project site in place Pejabat Daerah Sik, i have identified several topics of study in accordance with the work done on the construction site. I have chosen the title the process of construction mosque. The real aim of the practical training is to provide an apportunity for students to practice the theory learned in the classroom and used for real work in industries. So students can acquire new knowledge and great experience during this industrial training while it helps the students to get jobs. In conclusion, this is absolutely compulsary industrial training conducted for all students because iy is the best method to exposed students to real working conditions on site. |
format |
Student Project |
author |
Muhamad Suhaimi, Nur Athirah |
author_facet |
Muhamad Suhaimi, Nur Athirah |
author_sort |
Muhamad Suhaimi, Nur Athirah |
title |
The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi |
title_short |
The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi |
title_full |
The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi |
title_fullStr |
The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi |
title_full_unstemmed |
The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi |
title_sort |
step construction process of “surau” at pejabat daerah sik, kedah / nur athirah muhamad suhaimi |
publishDate |
2015 |
url |
https://ir.uitm.edu.my/id/eprint/62960/1/62960.pdf https://ir.uitm.edu.my/id/eprint/62960/ |
_version_ |
1738513993902850048 |