Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]

Large building is a complex thing to be manage. It must be manage in proper way to prolong the building life and increase the value of the building by avoiding any problem occur that can harm the building and the occupants of the building. To manage a large building, someone must have knowledge on a...

Full description

Saved in:
Bibliographic Details
Main Authors: Baharom, Mohamad Aziz Izzuddin, Tajuddin, Shafiq Taqiuddin, Sahdun, Mohammad Hasif Hazim, Joseph Garan, Benedict Sandin, Shamshul Bhari, Siti Nurbaya
Format: Student Project
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/64903/1/64903.pdf
https://ir.uitm.edu.my/id/eprint/64903/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.64903
record_format eprints
spelling my.uitm.ir.649032022-08-29T01:35:28Z https://ir.uitm.edu.my/id/eprint/64903/ Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.] Baharom, Mohamad Aziz Izzuddin Tajuddin, Shafiq Taqiuddin Sahdun, Mohammad Hasif Hazim Joseph Garan, Benedict Sandin Shamshul Bhari, Siti Nurbaya TH Building construction Details in building design and construction.Including walls, roofs Maintenance and repair Large building is a complex thing to be manage. It must be manage in proper way to prolong the building life and increase the value of the building by avoiding any problem occur that can harm the building and the occupants of the building. To manage a large building, someone must have knowledge on all aspect such as in management aspect and maintenance aspect to handle the property efficiently. Purpose of this investigation on Immigration building that located at Putrajaya is to reveal the important aspects of maintenance management, technology, design, property, building economic, finance, law, communications, project planning and project management of the building. Immigration building is a large building category and to control the building is not a easy work. There are many systems to be control and maintain to operate the building. Without proper method of controlling and maintenance the building will not able to operate smoothly. In this report there are information about how the building is operated. There are include all types of system been used by Immigration building to be operate efficiently. It also provide all aspects that must be taken to operate the building. In conclusion, a large building is a very complex to be manage. It need a proper management and maintenance to operate the building. Aspects such as maintenance management, technology, design, property, building economic, finance, law, communications, project planning, and project management of the building is a important aspects to operate the building smoothly. 2015 Student Project NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/64903/1/64903.pdf Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]. (2015) [Student Project] <http://terminalib.uitm.edu.my/64903.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic TH Building construction
Details in building design and construction.Including walls, roofs
Maintenance and repair
spellingShingle TH Building construction
Details in building design and construction.Including walls, roofs
Maintenance and repair
Baharom, Mohamad Aziz Izzuddin
Tajuddin, Shafiq Taqiuddin
Sahdun, Mohammad Hasif Hazim
Joseph Garan, Benedict Sandin
Shamshul Bhari, Siti Nurbaya
Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]
description Large building is a complex thing to be manage. It must be manage in proper way to prolong the building life and increase the value of the building by avoiding any problem occur that can harm the building and the occupants of the building. To manage a large building, someone must have knowledge on all aspect such as in management aspect and maintenance aspect to handle the property efficiently. Purpose of this investigation on Immigration building that located at Putrajaya is to reveal the important aspects of maintenance management, technology, design, property, building economic, finance, law, communications, project planning and project management of the building. Immigration building is a large building category and to control the building is not a easy work. There are many systems to be control and maintain to operate the building. Without proper method of controlling and maintenance the building will not able to operate smoothly. In this report there are information about how the building is operated. There are include all types of system been used by Immigration building to be operate efficiently. It also provide all aspects that must be taken to operate the building. In conclusion, a large building is a very complex to be manage. It need a proper management and maintenance to operate the building. Aspects such as maintenance management, technology, design, property, building economic, finance, law, communications, project planning, and project management of the building is a important aspects to operate the building smoothly.
format Student Project
author Baharom, Mohamad Aziz Izzuddin
Tajuddin, Shafiq Taqiuddin
Sahdun, Mohammad Hasif Hazim
Joseph Garan, Benedict Sandin
Shamshul Bhari, Siti Nurbaya
author_facet Baharom, Mohamad Aziz Izzuddin
Tajuddin, Shafiq Taqiuddin
Sahdun, Mohammad Hasif Hazim
Joseph Garan, Benedict Sandin
Shamshul Bhari, Siti Nurbaya
author_sort Baharom, Mohamad Aziz Izzuddin
title Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]
title_short Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]
title_full Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]
title_fullStr Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]
title_full_unstemmed Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]
title_sort immigration building / mohamad aziz izzuddin baharom... [et al.]
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/64903/1/64903.pdf
https://ir.uitm.edu.my/id/eprint/64903/
_version_ 1743110421887320064