Grand Kampar Hotel Kampar / Amirul Ammar Huzaimi ... [et al.]

Final Integrated Project consist of Ten (10) chapter. The case study is Grand Kampar Hotel (GKH). In first chapter, it story about the building information include the building background, the building facilities and utilities and location of the building. In second chapter, there are many subject a...

Full description

Saved in:
Bibliographic Details
Main Authors: Huzaimi, Amirul Ammar, Muhamad Zaidi, Muhamad Haikal, Azami, Muhammad Aiman, Mohamed, Nur Anis Asneeda, Waruzi, Wan Nurshazwani
Format: Student Project
Language:English
Published: 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/65454/1/65454.pdf
https://ir.uitm.edu.my/id/eprint/65454/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English

Similar Items