Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin

Industrialized Building System (IBS) is defined as a construction made of components manufactured either on or off site, then positioned and assembled into structures. The government has taken a few initiatives in order to encourage the practitioners to implement IBS in their project but the rate of...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammad Shukri, Alya Ilyani, Husin, Husrul Nizam
Format: Conference or Workshop Item
Language:English
Published: 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/73601/1/73601.pdf
https://ir.uitm.edu.my/id/eprint/73601/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.73601
record_format eprints
spelling my.uitm.ir.736012023-03-21T02:15:15Z https://ir.uitm.edu.my/id/eprint/73601/ Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin Mohammad Shukri, Alya Ilyani Husin, Husrul Nizam Systems of building construction. Industrialized building Management of the construction site. Superintendence of building construction Industrialized Building System (IBS) is defined as a construction made of components manufactured either on or off site, then positioned and assembled into structures. The government has taken a few initiatives in order to encourage the practitioners to implement IBS in their project but the rate of usage of IBS is still low. The aim of this research is to study the direct and indirect cost involved in IBS construction. Objectives of the research are to identify the direct and indirect cost from the usage of IBS construction, to determine how the direct and indirect cost affect the usage of IBS construction and to recommend the improvement of IBS contractors involved with the IBS construction. In order to achieve this objective, a quantitative method of research is used and questionnaires as the tools for data collection. All data shall be analyzed using Statistical Package for Social Science (SPSS) software. All of the direct and indirect costs were known and familiar to the Contractor as most costs were known as very important costs in implementing IBS. Direct cost affects the implementation of IBS as the direct cost involvement is high. It became one of the causes behind the lack of implementation of IBS. However, indirect costs involved somehow gave advantages to the Contractors as they get profit and incentives from the Government. The result of this study may increase the number of IBS construction since the cost involved is clearly highlighted and how these costs can give advantages to the project. 2021 Conference or Workshop Item PeerReviewed text en https://ir.uitm.edu.my/id/eprint/73601/1/73601.pdf Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin. (2021) In: Virtual Go-Green: Conference and Publication (V-Go Green 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Systems of building construction. Industrialized building
Management of the construction site. Superintendence of building construction
spellingShingle Systems of building construction. Industrialized building
Management of the construction site. Superintendence of building construction
Mohammad Shukri, Alya Ilyani
Husin, Husrul Nizam
Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin
description Industrialized Building System (IBS) is defined as a construction made of components manufactured either on or off site, then positioned and assembled into structures. The government has taken a few initiatives in order to encourage the practitioners to implement IBS in their project but the rate of usage of IBS is still low. The aim of this research is to study the direct and indirect cost involved in IBS construction. Objectives of the research are to identify the direct and indirect cost from the usage of IBS construction, to determine how the direct and indirect cost affect the usage of IBS construction and to recommend the improvement of IBS contractors involved with the IBS construction. In order to achieve this objective, a quantitative method of research is used and questionnaires as the tools for data collection. All data shall be analyzed using Statistical Package for Social Science (SPSS) software. All of the direct and indirect costs were known and familiar to the Contractor as most costs were known as very important costs in implementing IBS. Direct cost affects the implementation of IBS as the direct cost involvement is high. It became one of the causes behind the lack of implementation of IBS. However, indirect costs involved somehow gave advantages to the Contractors as they get profit and incentives from the Government. The result of this study may increase the number of IBS construction since the cost involved is clearly highlighted and how these costs can give advantages to the project.
format Conference or Workshop Item
author Mohammad Shukri, Alya Ilyani
Husin, Husrul Nizam
author_facet Mohammad Shukri, Alya Ilyani
Husin, Husrul Nizam
author_sort Mohammad Shukri, Alya Ilyani
title Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin
title_short Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin
title_full Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin
title_fullStr Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin
title_full_unstemmed Direct and indirect costs involved in implementing Industrialized Building System (IBS) construction / Alya Ilyani Mohammad Shukri and Husrul Nizam Husin
title_sort direct and indirect costs involved in implementing industrialized building system (ibs) construction / alya ilyani mohammad shukri and husrul nizam husin
publishDate 2021
url https://ir.uitm.edu.my/id/eprint/73601/1/73601.pdf
https://ir.uitm.edu.my/id/eprint/73601/
_version_ 1761622337039368192