Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa

Variation order is a formal document used for any form of amendment during construction on an agreed-upon, well-defined scope or schedule of works. Variations are mostly inevitable despite leading to dispute among stakeholders, affecting labour's productivity and consume time and cost. Variatio...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdullah, Mohd Nazri, Syed Mustapa, Syed Haris
Format: Conference or Workshop Item
Language:English
Published: 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/74358/1/74358.pdf
https://ir.uitm.edu.my/id/eprint/74358/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.74358
record_format eprints
spelling my.uitm.ir.743582023-03-21T03:29:25Z https://ir.uitm.edu.my/id/eprint/74358/ Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa Abdullah, Mohd Nazri Syed Mustapa, Syed Haris Management of the construction site. Superintendence of building construction Construction by phase of the work (Building trades) Variation order is a formal document used for any form of amendment during construction on an agreed-upon, well-defined scope or schedule of works. Variations are mostly inevitable despite leading to dispute among stakeholders, affecting labour's productivity and consume time and cost. Variation order was treated variedly according to the conditions of the contract of the particular construction. This study focused on mosque projects as per Public Work Department condition of contract which is Public Work Department Form of Contract PWD203a 2010 with quantity and Public Work Department Form of Contract PWD203 2010 with drawings and specifications. Both of the articles of agreement partake different approaches on variation order calculation specifically on the cost incurred. This paper aims to identify the variation order factors of mosque construction in Perak and identify the contributors that caused variation orders of mosque constructions in Perak, Malaysia.This research employs document analysis and a total of 10 projects have been analysed. 2021 Conference or Workshop Item PeerReviewed text en https://ir.uitm.edu.my/id/eprint/74358/1/74358.pdf Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa. (2021) In: Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
spellingShingle Management of the construction site. Superintendence of building construction
Construction by phase of the work (Building trades)
Abdullah, Mohd Nazri
Syed Mustapa, Syed Haris
Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa
description Variation order is a formal document used for any form of amendment during construction on an agreed-upon, well-defined scope or schedule of works. Variations are mostly inevitable despite leading to dispute among stakeholders, affecting labour's productivity and consume time and cost. Variation order was treated variedly according to the conditions of the contract of the particular construction. This study focused on mosque projects as per Public Work Department condition of contract which is Public Work Department Form of Contract PWD203a 2010 with quantity and Public Work Department Form of Contract PWD203 2010 with drawings and specifications. Both of the articles of agreement partake different approaches on variation order calculation specifically on the cost incurred. This paper aims to identify the variation order factors of mosque construction in Perak and identify the contributors that caused variation orders of mosque constructions in Perak, Malaysia.This research employs document analysis and a total of 10 projects have been analysed.
format Conference or Workshop Item
author Abdullah, Mohd Nazri
Syed Mustapa, Syed Haris
author_facet Abdullah, Mohd Nazri
Syed Mustapa, Syed Haris
author_sort Abdullah, Mohd Nazri
title Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa
title_short Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa
title_full Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa
title_fullStr Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa
title_full_unstemmed Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa
title_sort factors causing variation orders of mosque construction in perak, malaysia: a case study / mohd nazri abdullah and syed haris syed mustapa
publishDate 2021
url https://ir.uitm.edu.my/id/eprint/74358/1/74358.pdf
https://ir.uitm.edu.my/id/eprint/74358/
_version_ 1761622362924515328