Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad

Recently, the construction industry has been moving towards industrial revolution 4.0 which has transformed the construction industry into a competitive digital ecosystem by adopting BEVI. BEVI has emerged as a major accelerator in Engineering and Construction industry operations since it is used to...

Full description

Saved in:
Bibliographic Details
Main Author: Wan Mohammad, Wan Nur Syazwani
Format: Thesis
Language:English
Published: 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/75237/1/75237.pdf
https://ir.uitm.edu.my/id/eprint/75237/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.75237
record_format eprints
spelling my.uitm.ir.752372023-05-29T06:46:11Z https://ir.uitm.edu.my/id/eprint/75237/ Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad Wan Mohammad, Wan Nur Syazwani Construction industry Information technology. Information systems Recently, the construction industry has been moving towards industrial revolution 4.0 which has transformed the construction industry into a competitive digital ecosystem by adopting BEVI. BEVI has emerged as a major accelerator in Engineering and Construction industry operations since it is used to improve visualization and productivity, the coordination of construction drawings and communication, planning, delivery, take-off and estimation, and off-site manufacturing. Thus, contractors have a vital role in adopting BEVI for transferring data from drawing to reality. Despite potential benefits for contractors through the adoption of BEVI, they are commonly regarded as slow adopters, lagging far behind when compared to other stakeholders. A preliminary study affirms that contractors are slow adopters and that the tools to assess and evaluate their BIM performance are absent. The failure to appreciate and comprehend existing BIM assessment models/tools from developed and developing countries have limited construction players' and contractors' benefits from BEVI. For this reason, the research aims to develop a BEVI Adoption Assessment Tool for BEVIbased projects in Malaysia. Data was obtained from unstructured interviews with 4 participants and semi-structured interviews with 8 participants as a preliminary study. Then a questionnaire survey (114 respondents) and semi-structured interviews (12 respondents) with G7 BEVI-based project contractors provided the main data. Consequently, four (4) essential elements of a BIM Adoption Assessment Framework for BEVI-based projects were identified through the comparative results of both collections. These are: Eight (8) BEVI Objectives (El); Thirteen (13) Uses of BEVI from planning/design to the construction phases (E2); Three (3) BEVI adoption components (i.e., technology (11), organisation (14) and information culture (13) (E3); and four (4) project performance criteria (E4). Furthermore, these four (4) elements were considered in the development of a BEVI Adoption Assessment Tool (BAAT) for BEVI-based projects. The development of BAAT was established using a Microsoft Excel Spreadsheet and is suitable for project lifecycle phases (i.e., from planning/design to the construction phases). 2022 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/75237/1/75237.pdf Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad. (2022) PhD thesis, thesis, Universiti Teknologi MARA (UiTM). <http://terminalib.uitm.edu.my/75237.pdf>
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Construction industry
Information technology. Information systems
spellingShingle Construction industry
Information technology. Information systems
Wan Mohammad, Wan Nur Syazwani
Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad
description Recently, the construction industry has been moving towards industrial revolution 4.0 which has transformed the construction industry into a competitive digital ecosystem by adopting BEVI. BEVI has emerged as a major accelerator in Engineering and Construction industry operations since it is used to improve visualization and productivity, the coordination of construction drawings and communication, planning, delivery, take-off and estimation, and off-site manufacturing. Thus, contractors have a vital role in adopting BEVI for transferring data from drawing to reality. Despite potential benefits for contractors through the adoption of BEVI, they are commonly regarded as slow adopters, lagging far behind when compared to other stakeholders. A preliminary study affirms that contractors are slow adopters and that the tools to assess and evaluate their BIM performance are absent. The failure to appreciate and comprehend existing BIM assessment models/tools from developed and developing countries have limited construction players' and contractors' benefits from BEVI. For this reason, the research aims to develop a BEVI Adoption Assessment Tool for BEVIbased projects in Malaysia. Data was obtained from unstructured interviews with 4 participants and semi-structured interviews with 8 participants as a preliminary study. Then a questionnaire survey (114 respondents) and semi-structured interviews (12 respondents) with G7 BEVI-based project contractors provided the main data. Consequently, four (4) essential elements of a BIM Adoption Assessment Framework for BEVI-based projects were identified through the comparative results of both collections. These are: Eight (8) BEVI Objectives (El); Thirteen (13) Uses of BEVI from planning/design to the construction phases (E2); Three (3) BEVI adoption components (i.e., technology (11), organisation (14) and information culture (13) (E3); and four (4) project performance criteria (E4). Furthermore, these four (4) elements were considered in the development of a BEVI Adoption Assessment Tool (BAAT) for BEVI-based projects. The development of BAAT was established using a Microsoft Excel Spreadsheet and is suitable for project lifecycle phases (i.e., from planning/design to the construction phases).
format Thesis
author Wan Mohammad, Wan Nur Syazwani
author_facet Wan Mohammad, Wan Nur Syazwani
author_sort Wan Mohammad, Wan Nur Syazwani
title Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad
title_short Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad
title_full Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad
title_fullStr Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad
title_full_unstemmed Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad
title_sort development of building information modeling (bim) adoption assessment tool for bim-based projects in malaysia / wan nur syazwani wan mohammad
publishDate 2022
url https://ir.uitm.edu.my/id/eprint/75237/1/75237.pdf
https://ir.uitm.edu.my/id/eprint/75237/
_version_ 1768011557195743232