Contract administration / Diyanah Abdul Gani

Contract administration is very important thing to elaborate, therefore this report will discuss about procedures for contract administration based on DID Manual 2009. This report explained more detail about Pre-Contract, Contractual Stage and Post-Contract. However, elaborate how to fullfill the re...

Full description

Saved in:
Bibliographic Details
Main Author: Abdul Gani, Diyanah
Format: Monograph
Language:English
Published: Universiti Teknologi MARA, Perak 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/76984/1/76984.pdf
https://ir.uitm.edu.my/id/eprint/76984/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
Description
Summary:Contract administration is very important thing to elaborate, therefore this report will discuss about procedures for contract administration based on DID Manual 2009. This report explained more detail about Pre-Contract, Contractual Stage and Post-Contract. However, elaborate how to fullfill the requirements in the guidelines. It will focus to the Owner and Consultant not only to determine that the work is proceeding in conformity with the contract documents, but also because it allows a final opportunity to detect any inaccuracies, ambiguities or inconsistencies in the design. Hence, all the standard procedures of DID manual to ensure duration of preparing all the documents complete on time. Then, this report will also look at the common mistakes made contractor upon submission of tender that can cause wasting of time and cost.