Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir
Disaster Recovery Plan is generally part of a larger, more extensive practice known as Business Continuity Planning. The ability to recover quickly and completely from any site failure is of paramount importance to organizations of all sizes - yet complexity and high costs prevent many from adequate...
Saved in:
Main Authors: | , , |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/92739/1/92739.pdf https://ir.uitm.edu.my/id/eprint/92739/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Teknologi Mara |
Language: | English |
id |
my.uitm.ir.92739 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.927392024-05-07T04:20:08Z https://ir.uitm.edu.my/id/eprint/92739/ Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir Kibat, Dionysia Mahmun, Mariam Amir, Pius Business records management Disaster Recovery Plan is generally part of a larger, more extensive practice known as Business Continuity Planning. The ability to recover quickly and completely from any site failure is of paramount importance to organizations of all sizes - yet complexity and high costs prevent many from adequately protecting themselves. For years, data recovery in the event of a disaster failed to be seen as important due to the thinking of disaster will be remotely happened to the organization. This paper describes the level of DR in SuriaGroup, its importance and the alternative solutions to bridge DR methodologies to help organizations overcome the challenges of tape and achieve maximum benefit's from their IT investments. The research is based on primary and secondary data within SuriaGroup, and from the findings this research found that data backup processes in SuriaGroup are well maintained, but not frequently tested and well documented. The paper provides two options in its recommendations, i.e conventional DR methodologies and automated DR system for the management to consider. This research is only a first attempt to explore the DR awareness and DR process in SuriaGroup. It is proposed that for future research more variables can be incorporated to expand the current study. 2010 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/92739/1/92739.pdf Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir. (2010) Masters thesis, thesis, Universiti Teknologi MARA, Sabah. |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Business records management |
spellingShingle |
Business records management Kibat, Dionysia Mahmun, Mariam Amir, Pius Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir |
description |
Disaster Recovery Plan is generally part of a larger, more extensive practice known as Business Continuity Planning. The ability to recover quickly and completely from any site failure is of paramount importance to organizations of all sizes - yet complexity and high costs prevent many from adequately protecting themselves. For years, data recovery in the event of a disaster failed to be seen as important due to the thinking of disaster will be remotely happened to the organization. This paper describes the level of DR in SuriaGroup, its importance and the alternative solutions to bridge DR methodologies to help organizations overcome the challenges of tape and achieve maximum benefit's from their IT investments. The research is based on primary and secondary data within SuriaGroup, and from the findings this research found that data backup processes in SuriaGroup are well maintained, but not frequently tested and well documented. The paper provides two options in its recommendations, i.e conventional DR methodologies and automated DR system for the management to consider. This research is only a first attempt to explore the DR awareness and DR process in SuriaGroup. It is proposed that for future research more variables can be incorporated to expand the current study. |
format |
Thesis |
author |
Kibat, Dionysia Mahmun, Mariam Amir, Pius |
author_facet |
Kibat, Dionysia Mahmun, Mariam Amir, Pius |
author_sort |
Kibat, Dionysia |
title |
Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir |
title_short |
Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir |
title_full |
Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir |
title_fullStr |
Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir |
title_full_unstemmed |
Evaluating the current data recovery process in SuriaGroup / Dionysia Kibat, Mariam Mahmun and Pius Amir |
title_sort |
evaluating the current data recovery process in suriagroup / dionysia kibat, mariam mahmun and pius amir |
publishDate |
2010 |
url |
https://ir.uitm.edu.my/id/eprint/92739/1/92739.pdf https://ir.uitm.edu.my/id/eprint/92739/ |
_version_ |
1800100574072406016 |