The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad

Industrialized Building Systems (IBS)refer to various pre-fabricated construction methods. IBS components are constructed separately beforehand, and they are assembled on-site afterwards. In Malaysia, IBS has improved building quality, productivity, occupational safety and health concerns, and reduc...

Full description

Saved in:
Bibliographic Details
Main Authors: Bahadun, Nursuhanis, Muhamad, Nurul Huda
Format: Conference or Workshop Item
Language:English
Published: 2023
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/98865/1/98865.pdf
https://ir.uitm.edu.my/id/eprint/98865/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Teknologi Mara
Language: English
id my.uitm.ir.98865
record_format eprints
spelling my.uitm.ir.988652024-09-25T16:10:21Z https://ir.uitm.edu.my/id/eprint/98865/ The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad Bahadun, Nursuhanis Muhamad, Nurul Huda Systems of building construction. Industrialized building Industrialized Building Systems (IBS)refer to various pre-fabricated construction methods. IBS components are constructed separately beforehand, and they are assembled on-site afterwards. In Malaysia, IBS has improved building quality, productivity, occupational safety and health concerns, and reduced construction costs. However, the adoption of IBS in the construction sector remains low due to limited modernization of construction procedures and methods. To fully implement IBS, efforts must be made to change current construction methods and train employees with specialization skills, such as coordination and installation. Thus, the aim of this research is to study the barrier of IBS adoption in Malaysian construction industry. The research objective for this study is to determine the main barriers of IBS adoption in Malaysian construction industry. The approach used for data collection for this study is quantitative method. The questionnaire were distributed to the IBS practitioners. The findings from this research revealed that the barriers of IBS adoption in Malaysian construction industry are lack of skill labour, high labour cost and high capital cost. This study will be beneficial to improve the level of IBS implementation in Malaysia. 2023-10 Conference or Workshop Item PeerReviewed text en https://ir.uitm.edu.my/id/eprint/98865/1/98865.pdf The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad. (2023) In: UNSPECIFIED.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Systems of building construction. Industrialized building
spellingShingle Systems of building construction. Industrialized building
Bahadun, Nursuhanis
Muhamad, Nurul Huda
The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad
description Industrialized Building Systems (IBS)refer to various pre-fabricated construction methods. IBS components are constructed separately beforehand, and they are assembled on-site afterwards. In Malaysia, IBS has improved building quality, productivity, occupational safety and health concerns, and reduced construction costs. However, the adoption of IBS in the construction sector remains low due to limited modernization of construction procedures and methods. To fully implement IBS, efforts must be made to change current construction methods and train employees with specialization skills, such as coordination and installation. Thus, the aim of this research is to study the barrier of IBS adoption in Malaysian construction industry. The research objective for this study is to determine the main barriers of IBS adoption in Malaysian construction industry. The approach used for data collection for this study is quantitative method. The questionnaire were distributed to the IBS practitioners. The findings from this research revealed that the barriers of IBS adoption in Malaysian construction industry are lack of skill labour, high labour cost and high capital cost. This study will be beneficial to improve the level of IBS implementation in Malaysia.
format Conference or Workshop Item
author Bahadun, Nursuhanis
Muhamad, Nurul Huda
author_facet Bahadun, Nursuhanis
Muhamad, Nurul Huda
author_sort Bahadun, Nursuhanis
title The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad
title_short The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad
title_full The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad
title_fullStr The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad
title_full_unstemmed The barriers of Industrialisation Building Sytem (IBS) adoption in Malaysian construction industry / Nursuhanis Bahadun and Nurul Huda Muhamad
title_sort barriers of industrialisation building sytem (ibs) adoption in malaysian construction industry / nursuhanis bahadun and nurul huda muhamad
publishDate 2023
url https://ir.uitm.edu.my/id/eprint/98865/1/98865.pdf
https://ir.uitm.edu.my/id/eprint/98865/
_version_ 1811598104005181440