Design & development of collaborative workflow for lean production in a repair & overhaul industry

Aerospace fuel nozzles maintenance, repair and overhaul operation is a dynamic process as the workflow is unpredictable. Further detail checking and analyzing on defects are needed in order to determine the workflow. The traditional paper based of work in progress information had been implementing a...

Full description

Saved in:
Bibliographic Details
Main Authors: Wah, T.Y., Peng, N.H., Hok, C.S.
Format: Conference or Workshop Item
Language:English
Published: 2009
Subjects:
Online Access:http://eprints.um.edu.my/10679/1/Design_%26_developmet.pdf
http://eprints.um.edu.my/10679/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaya
Language: English
id my.um.eprints.10679
record_format eprints
spelling my.um.eprints.106792014-08-25T01:28:24Z http://eprints.um.edu.my/10679/ Design & development of collaborative workflow for lean production in a repair & overhaul industry Wah, T.Y. Peng, N.H. Hok, C.S. QA Mathematics Aerospace fuel nozzles maintenance, repair and overhaul operation is a dynamic process as the workflow is unpredictable. Further detail checking and analyzing on defects are needed in order to determine the workflow. The traditional paper based of work in progress information had been implementing as to manage the nozzles production. However, paper based of work in progress information is inefficient in dealing with these unpredictable and complex workflows. There is a probability of entering or recording the error information when it is in paper based system. This wrong information will cause problem in production line as the results are inconsistent. Furthermore, this inaccurate result will lead to difficulty in tracking the nozzles. Excessive time is needed and wasted in indentifying and correcting the errors. Hence, an electronic based of work in progress system is apparently required as to overcome the shortcoming of the paper based tracking and also to enhance the efficiency of production line. This paper will describe the configurable and customizable work in progress tracking system as a mean to improve over the traditional paper based system. 2009-05 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.um.edu.my/10679/1/Design_%26_developmet.pdf Wah, T.Y. and Peng, N.H. and Hok, C.S. (2009) Design & development of collaborative workflow for lean production in a repair & overhaul industry. In: Proceedings of the 8th WSEAS International Conference on Applied Computer and Applied Computational Science, 20-22 May 2009, Hangzhou, China.
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
language English
topic QA Mathematics
spellingShingle QA Mathematics
Wah, T.Y.
Peng, N.H.
Hok, C.S.
Design & development of collaborative workflow for lean production in a repair & overhaul industry
description Aerospace fuel nozzles maintenance, repair and overhaul operation is a dynamic process as the workflow is unpredictable. Further detail checking and analyzing on defects are needed in order to determine the workflow. The traditional paper based of work in progress information had been implementing as to manage the nozzles production. However, paper based of work in progress information is inefficient in dealing with these unpredictable and complex workflows. There is a probability of entering or recording the error information when it is in paper based system. This wrong information will cause problem in production line as the results are inconsistent. Furthermore, this inaccurate result will lead to difficulty in tracking the nozzles. Excessive time is needed and wasted in indentifying and correcting the errors. Hence, an electronic based of work in progress system is apparently required as to overcome the shortcoming of the paper based tracking and also to enhance the efficiency of production line. This paper will describe the configurable and customizable work in progress tracking system as a mean to improve over the traditional paper based system.
format Conference or Workshop Item
author Wah, T.Y.
Peng, N.H.
Hok, C.S.
author_facet Wah, T.Y.
Peng, N.H.
Hok, C.S.
author_sort Wah, T.Y.
title Design & development of collaborative workflow for lean production in a repair & overhaul industry
title_short Design & development of collaborative workflow for lean production in a repair & overhaul industry
title_full Design & development of collaborative workflow for lean production in a repair & overhaul industry
title_fullStr Design & development of collaborative workflow for lean production in a repair & overhaul industry
title_full_unstemmed Design & development of collaborative workflow for lean production in a repair & overhaul industry
title_sort design & development of collaborative workflow for lean production in a repair & overhaul industry
publishDate 2009
url http://eprints.um.edu.my/10679/1/Design_%26_developmet.pdf
http://eprints.um.edu.my/10679/
_version_ 1643688862914969600