Managing refurbishment projects through selection of procurement system: The case of Malaysia

The type of procurement method determines how the project would be managed. This is because project uncertainty could be found in the way that projects are awarded and how the construction project is managed into a system of contract. Procurement methods also influenced the time performance of cons...

Full description

Saved in:
Bibliographic Details
Main Authors: Ali, A.S., Au-Yong, C.P., Ling, S.C.
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.um.edu.my/11407/1/0001.pdf
http://eprints.um.edu.my/11407/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaya
Language: English
id my.um.eprints.11407
record_format eprints
spelling my.um.eprints.114072014-12-21T07:51:38Z http://eprints.um.edu.my/11407/ Managing refurbishment projects through selection of procurement system: The case of Malaysia Ali, A.S. Au-Yong, C.P. Ling, S.C. T Technology (General) The type of procurement method determines how the project would be managed. This is because project uncertainty could be found in the way that projects are awarded and how the construction project is managed into a system of contract. Procurement methods also influenced the time performance of construction projects. Time would be affected by the flow of project that was driven by different type of procurement method. However, it's still inconclusive to what extent that different types of procurement systems could affect the performance of refurbishment projects. This study conducted to identify types of procurement methods used in Malaysian refurbishment projects and what are the problems and difficulties encountered by contractor using different types of procurement systems. On top of that, the study also would examine relationship between challenges encountered by contractors using different types of procurements towards refurbishment projects performance. Triangulation technique was used in the study. 316 sets of closed ended questionnaires were obtained from targeted respondents which included site agents, project engineer, contract administrator, contract manager and project manager who were working in various construction companies. From the questionnaire sent out, 268 questionnaires were found to be useful for data analysis,giving a final response percentage of 24.53%. Semi-structured interview has been carried out with 15 contractors to validate the result. The findings shown that 54.3% of the projects were used traditional procurement systems, 39.9% using design and build, 4.3% using management procurement, 1.1% of the refurbishment project using turnkey system and 0.3% using built-operate-transfer (BOT) system. Refurbishment projects using traditional procurement systems were performing well compared to the others. Besides, out of seven contractor challenges variables (independent) which are cash flow and financial, communication with client and consultants, client decision making, frequent change order by client, insufficient or discrepancies of contract documents, material price escalation and skill, expertise and experience tested were significantly correlated with at least one performance variable (dependent). The findings would be useful for future references, especially to those stakeholders who involved in refurbishment projects in Malaysia. 2014-09 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.um.edu.my/11407/1/0001.pdf Ali, A.S. and Au-Yong, C.P. and Ling, S.C. (2014) Managing refurbishment projects through selection of procurement system: The case of Malaysia. In: Proceedings of the 2nd International Conference on Sustainable Development, 26-27 Sep 2014, Rome, Italy.
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
language English
topic T Technology (General)
spellingShingle T Technology (General)
Ali, A.S.
Au-Yong, C.P.
Ling, S.C.
Managing refurbishment projects through selection of procurement system: The case of Malaysia
description The type of procurement method determines how the project would be managed. This is because project uncertainty could be found in the way that projects are awarded and how the construction project is managed into a system of contract. Procurement methods also influenced the time performance of construction projects. Time would be affected by the flow of project that was driven by different type of procurement method. However, it's still inconclusive to what extent that different types of procurement systems could affect the performance of refurbishment projects. This study conducted to identify types of procurement methods used in Malaysian refurbishment projects and what are the problems and difficulties encountered by contractor using different types of procurement systems. On top of that, the study also would examine relationship between challenges encountered by contractors using different types of procurements towards refurbishment projects performance. Triangulation technique was used in the study. 316 sets of closed ended questionnaires were obtained from targeted respondents which included site agents, project engineer, contract administrator, contract manager and project manager who were working in various construction companies. From the questionnaire sent out, 268 questionnaires were found to be useful for data analysis,giving a final response percentage of 24.53%. Semi-structured interview has been carried out with 15 contractors to validate the result. The findings shown that 54.3% of the projects were used traditional procurement systems, 39.9% using design and build, 4.3% using management procurement, 1.1% of the refurbishment project using turnkey system and 0.3% using built-operate-transfer (BOT) system. Refurbishment projects using traditional procurement systems were performing well compared to the others. Besides, out of seven contractor challenges variables (independent) which are cash flow and financial, communication with client and consultants, client decision making, frequent change order by client, insufficient or discrepancies of contract documents, material price escalation and skill, expertise and experience tested were significantly correlated with at least one performance variable (dependent). The findings would be useful for future references, especially to those stakeholders who involved in refurbishment projects in Malaysia.
format Conference or Workshop Item
author Ali, A.S.
Au-Yong, C.P.
Ling, S.C.
author_facet Ali, A.S.
Au-Yong, C.P.
Ling, S.C.
author_sort Ali, A.S.
title Managing refurbishment projects through selection of procurement system: The case of Malaysia
title_short Managing refurbishment projects through selection of procurement system: The case of Malaysia
title_full Managing refurbishment projects through selection of procurement system: The case of Malaysia
title_fullStr Managing refurbishment projects through selection of procurement system: The case of Malaysia
title_full_unstemmed Managing refurbishment projects through selection of procurement system: The case of Malaysia
title_sort managing refurbishment projects through selection of procurement system: the case of malaysia
publishDate 2014
url http://eprints.um.edu.my/11407/1/0001.pdf
http://eprints.um.edu.my/11407/
_version_ 1643689050666696704