Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams

This research proposed an optimal method of intermediate anchor to prevent premature debonding failure of anchor plate for eliminating premature shear failure of CFRP laminate flexurally strengthened reinforced concrete (RC) beam. In the experimental programme, seven RC beam specimens were prepared...

Full description

Saved in:
Bibliographic Details
Main Authors: Alam, M.A., Jumaat, Mohd Zamin
Format: Article
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.um.edu.my/15668/1/Prevention_of_Debonding_Failure_of_Intermediate_Anchor_to_Eliminate_Premature_Shear_Failure.pdf
http://eprints.um.edu.my/15668/
http://link.springer.com/article/10.1007%2Fs13369-015-1739-1
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaya
Language: English
id my.um.eprints.15668
record_format eprints
spelling my.um.eprints.156682020-02-05T04:47:15Z http://eprints.um.edu.my/15668/ Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams Alam, M.A. Jumaat, Mohd Zamin T Technology (General) TA Engineering (General). Civil engineering (General) This research proposed an optimal method of intermediate anchor to prevent premature debonding failure of anchor plate for eliminating premature shear failure of CFRP laminate flexurally strengthened reinforced concrete (RC) beam. In the experimental programme, seven RC beam specimens were prepared which included un-strengthened control beam and flexurally strengthened beams with CFRP laminate. The flexurally strengthened beams were further shear strengthened using L-shaped intermediate anchors based on proposed and conventional methods. The experimental results of specimens were compared with the numerical results. Theoretical model had also been proposed to predict the debonding failure of intermediate anchors. Results showed that the anchors obtained based on the proposed design guideline prevented premature debonding failure of anchor plates completely and thus, the proposed intermediate anchored strengthened beams did not show premature shear failures. Whereas beams having the anchor plates based on conventional method failed by premature debonding of anchor plates followed by premature shear. The proposed intermediate anchors significantly increased the ultimate loads and ductility of the beams as compared to conventional one. It also reduced the number and widths of cracks in shear span. The theoretical model could predict the debonding failure load of intermediate anchor which was comparable with the experimental finding. Finally, numerical model predicted the structural behaviour of proposed intermediate anchored strengthened beams satisfactorily. 2015-08 Article PeerReviewed application/pdf en http://eprints.um.edu.my/15668/1/Prevention_of_Debonding_Failure_of_Intermediate_Anchor_to_Eliminate_Premature_Shear_Failure.pdf Alam, M.A. and Jumaat, Mohd Zamin (2015) Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams. Arabian Journal for Science and Engineering, 40 (8). pp. 2219-2232. ISSN 1319-8025 http://link.springer.com/article/10.1007%2Fs13369-015-1739-1 10.1007/s13369-015-1739-1
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
language English
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
Alam, M.A.
Jumaat, Mohd Zamin
Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams
description This research proposed an optimal method of intermediate anchor to prevent premature debonding failure of anchor plate for eliminating premature shear failure of CFRP laminate flexurally strengthened reinforced concrete (RC) beam. In the experimental programme, seven RC beam specimens were prepared which included un-strengthened control beam and flexurally strengthened beams with CFRP laminate. The flexurally strengthened beams were further shear strengthened using L-shaped intermediate anchors based on proposed and conventional methods. The experimental results of specimens were compared with the numerical results. Theoretical model had also been proposed to predict the debonding failure of intermediate anchors. Results showed that the anchors obtained based on the proposed design guideline prevented premature debonding failure of anchor plates completely and thus, the proposed intermediate anchored strengthened beams did not show premature shear failures. Whereas beams having the anchor plates based on conventional method failed by premature debonding of anchor plates followed by premature shear. The proposed intermediate anchors significantly increased the ultimate loads and ductility of the beams as compared to conventional one. It also reduced the number and widths of cracks in shear span. The theoretical model could predict the debonding failure load of intermediate anchor which was comparable with the experimental finding. Finally, numerical model predicted the structural behaviour of proposed intermediate anchored strengthened beams satisfactorily.
format Article
author Alam, M.A.
Jumaat, Mohd Zamin
author_facet Alam, M.A.
Jumaat, Mohd Zamin
author_sort Alam, M.A.
title Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams
title_short Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams
title_full Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams
title_fullStr Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams
title_full_unstemmed Prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams
title_sort prevention of debonding failure of intermediate anchor to eliminate premature shear failure of flexurally strengthened reinforced concrete beams
publishDate 2015
url http://eprints.um.edu.my/15668/1/Prevention_of_Debonding_Failure_of_Intermediate_Anchor_to_Eliminate_Premature_Shear_Failure.pdf
http://eprints.um.edu.my/15668/
http://link.springer.com/article/10.1007%2Fs13369-015-1739-1
_version_ 1662755141853380608