Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach

Failure to communicate effectively and poor project knowledge continue to plague the construction industry, particularly concerning delay management and cost control. This paper aims to empirically examine the influence of project communication management and project learning as preventive measures...

Full description

Saved in:
Bibliographic Details
Main Authors: Yap, Jeffrey Boon Hui, Abdul-Rahman, Hamzah, Wang, Chen
Format: Article
Published: American Society of Civil Engineers 2018
Subjects:
Online Access:http://eprints.um.edu.my/20313/
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001456
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaya
id my.um.eprints.20313
record_format eprints
spelling my.um.eprints.203132019-02-14T07:13:40Z http://eprints.um.edu.my/20313/ Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach Yap, Jeffrey Boon Hui Abdul-Rahman, Hamzah Wang, Chen TH Building construction Failure to communicate effectively and poor project knowledge continue to plague the construction industry, particularly concerning delay management and cost control. This paper aims to empirically examine the influence of project communication management and project learning as preventive measures to mitigate time-cost overruns. Based on a comprehensive literature review, a conceptual framework was developed. A two-stage data collection was used, namely semistructured interviews and a broad questionnaire survey. The qualitative data was analyzed by content analysis of critical incidents. Partial least-squared based structural equation modeling (PLS-SEM) analyses statistically tested the model hypotheses. The results suggest that project communications and project learning contribute positively to time-cost performance of construction projects. Effective communication tools, critical learning situations, and essential reusable project knowledge are identified. Collective sharing of experiences facilitates personal development and enables effective project learning. A triangulated approach was adopted to conceptualize the control loop-process emphasis on networking and communication, collaborative learning, experience accumulation, and expert judgment as critical elements of continuous learning. As such, this study advances the current knowledge of exploiting project communication management and project learning in mitigating time-cost overruns in construction. American Society of Civil Engineers 2018 Article PeerReviewed Yap, Jeffrey Boon Hui and Abdul-Rahman, Hamzah and Wang, Chen (2018) Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach. Journal of Construction Engineering and Management, 144 (5). 04018025. ISSN 0733-9364 https://doi.org/10.1061/(ASCE)CO.1943-7862.0001456 doi:10.1061/(ASCE)CO.1943-7862.0001456
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Research Repository
url_provider http://eprints.um.edu.my/
topic TH Building construction
spellingShingle TH Building construction
Yap, Jeffrey Boon Hui
Abdul-Rahman, Hamzah
Wang, Chen
Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
description Failure to communicate effectively and poor project knowledge continue to plague the construction industry, particularly concerning delay management and cost control. This paper aims to empirically examine the influence of project communication management and project learning as preventive measures to mitigate time-cost overruns. Based on a comprehensive literature review, a conceptual framework was developed. A two-stage data collection was used, namely semistructured interviews and a broad questionnaire survey. The qualitative data was analyzed by content analysis of critical incidents. Partial least-squared based structural equation modeling (PLS-SEM) analyses statistically tested the model hypotheses. The results suggest that project communications and project learning contribute positively to time-cost performance of construction projects. Effective communication tools, critical learning situations, and essential reusable project knowledge are identified. Collective sharing of experiences facilitates personal development and enables effective project learning. A triangulated approach was adopted to conceptualize the control loop-process emphasis on networking and communication, collaborative learning, experience accumulation, and expert judgment as critical elements of continuous learning. As such, this study advances the current knowledge of exploiting project communication management and project learning in mitigating time-cost overruns in construction.
format Article
author Yap, Jeffrey Boon Hui
Abdul-Rahman, Hamzah
Wang, Chen
author_facet Yap, Jeffrey Boon Hui
Abdul-Rahman, Hamzah
Wang, Chen
author_sort Yap, Jeffrey Boon Hui
title Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
title_short Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
title_full Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
title_fullStr Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
title_full_unstemmed Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach
title_sort preventive mitigation of overruns with project communication management and continuous learning: pls-sem approach
publisher American Society of Civil Engineers
publishDate 2018
url http://eprints.um.edu.my/20313/
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001456
_version_ 1643691242532372480