The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2012
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te= http://studentsrepo.um.edu.my/3587/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaya |
id |
my.um.stud.3587 |
---|---|
record_format |
eprints |
spelling |
my.um.stud.35872013-08-20T04:17:50Z The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman Mohd Azrai, Azman TH Building construction 2012-08-09 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te= Mohd Azrai, Azman (2012) The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman. Masters thesis, University of Malaya. http://studentsrepo.um.edu.my/3587/ |
institution |
Universiti Malaya |
building |
UM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaya |
content_source |
UM Student Repository |
url_provider |
http://studentsrepo.um.edu.my/ |
topic |
TH Building construction |
spellingShingle |
TH Building construction Mohd Azrai, Azman The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
format |
Thesis |
author |
Mohd Azrai, Azman |
author_facet |
Mohd Azrai, Azman |
author_sort |
Mohd Azrai, Azman |
title |
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
title_short |
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
title_full |
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
title_fullStr |
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
title_full_unstemmed |
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman |
title_sort |
accuracy of preliminary cost estimates in public works department (pwd) of peninsular malaysia / mohd azrai azman |
publishDate |
2012 |
url |
http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te= http://studentsrepo.um.edu.my/3587/ |
_version_ |
1738505586206572544 |