The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman

Saved in:
Bibliographic Details
Main Author: Mohd Azrai, Azman
Format: Thesis
Published: 2012
Subjects:
Online Access:http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf
http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te=
http://studentsrepo.um.edu.my/3587/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaya
id my.um.stud.3587
record_format eprints
spelling my.um.stud.35872013-08-20T04:17:50Z The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman Mohd Azrai, Azman TH Building construction 2012-08-09 Thesis NonPeerReviewed application/pdf http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te= Mohd Azrai, Azman (2012) The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman. Masters thesis, University of Malaya. http://studentsrepo.um.edu.my/3587/
institution Universiti Malaya
building UM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaya
content_source UM Student Repository
url_provider http://studentsrepo.um.edu.my/
topic TH Building construction
spellingShingle TH Building construction
Mohd Azrai, Azman
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
format Thesis
author Mohd Azrai, Azman
author_facet Mohd Azrai, Azman
author_sort Mohd Azrai, Azman
title The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_short The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_full The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_fullStr The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_full_unstemmed The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman
title_sort accuracy of preliminary cost estimates in public works department (pwd) of peninsular malaysia / mohd azrai azman
publishDate 2012
url http://studentsrepo.um.edu.my/3587/1/Mohd_Azrai_%2D_THE_ACCURACY_OF_PRELIMINARY_COST_ESTIMATES_IN_PUBLIC_WORKS_DEPARTMENT__PWD__OF_PENINSULAR_MALAYSI.pdf
http://pendeta.um.edu.my/client/default/search/results?qu=The+accuracy+of+preliminary+cost+estimates+in+Public+Works+Department+%28PWD%29+of+Peninsular+Malaysia&te=
http://studentsrepo.um.edu.my/3587/
_version_ 1738505586206572544