Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects

Current studies shows that most of the Industrialised Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach. This traditional construction process has been widely criticized for its fragmented approach to project delivery and its fail...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nasrun, Mohd Nawi, Ahmad Tarmizi, Haron, Zuhairi, Abd Hamid, Kamarul Anuar, Mohamad Kamar, Yusnizam, Baharuddin
Format: Article
Language:English
English
Published: Construction Research Institute of Malaysia 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/10227/1/Improving%20Integrated%20Practice%20through%20Building%20Information%20Modeling-Integrated%20Project%20Delivery%20%28BIM-IPD%29%20for%20Malaysian%20Industrialised%20Building%20System%20%28IBS%29%20Construction%20Projects.pdf
http://umpir.ump.edu.my/id/eprint/10227/6/fkasa-2015-tarmizi-Improving%20Integrated%20practice%20through.pdf
http://umpir.ump.edu.my/id/eprint/10227/
https://www.researchgate.net/publication/286546504
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
English
Be the first to leave a comment!
You must be logged in first