Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study

Downtime loss due to long set-up time will lead to shorter actual production time. This situation will result in a loss to the company because they could not produce their products as planned. Therefore, set-up time needs to be reduced to maximize the resources invested by the company. The most popu...

Full description

Saved in:
Bibliographic Details
Main Authors: Muhamad Arifpin, Mansor, A. R., Ismail, M. R. M., Yasin, A., Halim
Format: Conference or Workshop Item
Language:English
English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/10893/1/Implementation%20of%20Single%20Minutes%20of%20Exchange%20Die%20%28SMED%29%20in%20Malaysia%20Metal%20Stamping%20Industry-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/10893/7/ftech-2015-arifpin-Implementation%20of%20Single%20Minutes.pdf
http://umpir.ump.edu.my/id/eprint/10893/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
English
id my.ump.umpir.10893
record_format eprints
spelling my.ump.umpir.108932018-10-17T02:57:01Z http://umpir.ump.edu.my/id/eprint/10893/ Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study Muhamad Arifpin, Mansor A. R., Ismail M. R. M., Yasin A., Halim T Technology (General) Downtime loss due to long set-up time will lead to shorter actual production time. This situation will result in a loss to the company because they could not produce their products as planned. Therefore, set-up time needs to be reduced to maximize the resources invested by the company. The most popular approach to is an approach to improve setup time is Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo in early 1960s. Setup operations were divided by into fundamental types; Internal setup and External setup. By Converting Internal setup to External setup, the company can reduced the setup time and thus, lead to longer actual production time. This paper presents an afford of a Malaysia’s metal stamping company in implementing SMED in their company. The company is a supplier of passenger car’s components to Malaysia’s major car makers. The implementation was carried out by separating Internal and External Setup, converting Internal to External Setup and finally streamlining all aspects of the setup operation. After implemented SMED approach, the company managed to reduce their set-up time from 32 minutes to 12 minutes. However, the company still working hard to achieve the objective of SMED, which is to complete all changeovers are in a single number of minutes or less than 10 minutes. 2015 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/10893/1/Implementation%20of%20Single%20Minutes%20of%20Exchange%20Die%20%28SMED%29%20in%20Malaysia%20Metal%20Stamping%20Industry-%20A%20Case%20Study.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/10893/7/ftech-2015-arifpin-Implementation%20of%20Single%20Minutes.pdf Muhamad Arifpin, Mansor and A. R., Ismail and M. R. M., Yasin and A., Halim (2015) Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study. In: The 4th International Congress on Natural Sciences and Engineering, 7-9 May 2015 , Kyoto, Japan. . (Unpublished)
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
topic T Technology (General)
spellingShingle T Technology (General)
Muhamad Arifpin, Mansor
A. R., Ismail
M. R. M., Yasin
A., Halim
Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study
description Downtime loss due to long set-up time will lead to shorter actual production time. This situation will result in a loss to the company because they could not produce their products as planned. Therefore, set-up time needs to be reduced to maximize the resources invested by the company. The most popular approach to is an approach to improve setup time is Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo in early 1960s. Setup operations were divided by into fundamental types; Internal setup and External setup. By Converting Internal setup to External setup, the company can reduced the setup time and thus, lead to longer actual production time. This paper presents an afford of a Malaysia’s metal stamping company in implementing SMED in their company. The company is a supplier of passenger car’s components to Malaysia’s major car makers. The implementation was carried out by separating Internal and External Setup, converting Internal to External Setup and finally streamlining all aspects of the setup operation. After implemented SMED approach, the company managed to reduce their set-up time from 32 minutes to 12 minutes. However, the company still working hard to achieve the objective of SMED, which is to complete all changeovers are in a single number of minutes or less than 10 minutes.
format Conference or Workshop Item
author Muhamad Arifpin, Mansor
A. R., Ismail
M. R. M., Yasin
A., Halim
author_facet Muhamad Arifpin, Mansor
A. R., Ismail
M. R. M., Yasin
A., Halim
author_sort Muhamad Arifpin, Mansor
title Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study
title_short Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study
title_full Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study
title_fullStr Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study
title_full_unstemmed Implementation of Single Minutes of Exchange Die (SMED) in Malaysia Metal Stamping Industry: A Case Study
title_sort implementation of single minutes of exchange die (smed) in malaysia metal stamping industry: a case study
publishDate 2015
url http://umpir.ump.edu.my/id/eprint/10893/1/Implementation%20of%20Single%20Minutes%20of%20Exchange%20Die%20%28SMED%29%20in%20Malaysia%20Metal%20Stamping%20Industry-%20A%20Case%20Study.pdf
http://umpir.ump.edu.my/id/eprint/10893/7/ftech-2015-arifpin-Implementation%20of%20Single%20Minutes.pdf
http://umpir.ump.edu.my/id/eprint/10893/
_version_ 1643666518309863424