A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness

Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo is an approach to improve changeover of die by reduction its setup time. Longer setup time will lead to shorter Availability in Overall Equipment Effectiveness (OEE), thus will give effect to the actual time of production. For this re...

Full description

Saved in:
Bibliographic Details
Main Authors: Muhamad Arifpin, Mansor, A. R., Ismail, Mohamad R., M. Yasin, A., Halim
Format: Conference or Workshop Item
Language:English
Published: Universiti Malaysia Pahang 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/14477/6/ftech-2015-arifpin-Framework%20for%20Measuring%20The%20Effect.pdf
http://umpir.ump.edu.my/id/eprint/14477/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
id my.ump.umpir.14477
record_format eprints
spelling my.ump.umpir.144772018-10-17T02:56:24Z http://umpir.ump.edu.my/id/eprint/14477/ A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness Muhamad Arifpin, Mansor A. R., Ismail Mohamad R., M. Yasin A., Halim TA Engineering (General). Civil engineering (General) Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo is an approach to improve changeover of die by reduction its setup time. Longer setup time will lead to shorter Availability in Overall Equipment Effectiveness (OEE), thus will give effect to the actual time of production. For this reason, a study need to be conducted to measure how the performance of setup or changeover process effect the Availability in OEE. This paper propose a framework on how to measure the effect of changeover time to OEE by using Data Envelopment Analysis (DEA). The study benchmark Single Minutes of Exchange Die process in the same production line dynamically. The manpower and the external setup time are the main inputs in this measuring process where the main output is the Availability of OEE. This framework can be used to determine the efficiency of converting internal setup time to external setup time. An efficient converting process from internal setup time to external setup time will give a good effect to the Availability and thus contribute to the longer production time. Universiti Malaysia Pahang 2015 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/14477/6/ftech-2015-arifpin-Framework%20for%20Measuring%20The%20Effect.pdf Muhamad Arifpin, Mansor and A. R., Ismail and Mohamad R., M. Yasin and A., Halim (2015) A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness. In: The 4th International Congress on Natural Sciences and Engineering, 7-9 May 2015 , Kyoto, Japan. pp. 1-9.. (Unpublished)
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Muhamad Arifpin, Mansor
A. R., Ismail
Mohamad R., M. Yasin
A., Halim
A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
description Single Minutes of Exchange Die (SMED), developed by Shigeo Shingo is an approach to improve changeover of die by reduction its setup time. Longer setup time will lead to shorter Availability in Overall Equipment Effectiveness (OEE), thus will give effect to the actual time of production. For this reason, a study need to be conducted to measure how the performance of setup or changeover process effect the Availability in OEE. This paper propose a framework on how to measure the effect of changeover time to OEE by using Data Envelopment Analysis (DEA). The study benchmark Single Minutes of Exchange Die process in the same production line dynamically. The manpower and the external setup time are the main inputs in this measuring process where the main output is the Availability of OEE. This framework can be used to determine the efficiency of converting internal setup time to external setup time. An efficient converting process from internal setup time to external setup time will give a good effect to the Availability and thus contribute to the longer production time.
format Conference or Workshop Item
author Muhamad Arifpin, Mansor
A. R., Ismail
Mohamad R., M. Yasin
A., Halim
author_facet Muhamad Arifpin, Mansor
A. R., Ismail
Mohamad R., M. Yasin
A., Halim
author_sort Muhamad Arifpin, Mansor
title A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_short A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_full A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_fullStr A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_full_unstemmed A Framework for Measuring The Effect of Changeover Time To Overall Equipment Effectiveness
title_sort framework for measuring the effect of changeover time to overall equipment effectiveness
publisher Universiti Malaysia Pahang
publishDate 2015
url http://umpir.ump.edu.my/id/eprint/14477/6/ftech-2015-arifpin-Framework%20for%20Measuring%20The%20Effect.pdf
http://umpir.ump.edu.my/id/eprint/14477/
_version_ 1643667442841419776