Modelling of Simple Assembly Line Balancing Problem Type 1 (SALBP-1) with Machine and Worker Constraints

This paper presents a mathematical model for Simple Assembly Line Problem Type 1 (SALBP-1) with resource constraints; machine and worker. The existing model of SALBP-1 assumes that all the workstations have similar capability, while in reality the workstation has different capability because of limi...

Full description

Saved in:
Bibliographic Details
Main Authors: N. H., Kamarudin, M. F. F., Ab Rashid
Format: Conference or Workshop Item
Language:English
English
Published: 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/19721/1/Modelling%20of%20Simple%20Assembly%20Line%20Balancing%20Problem%20Type%201%20%28SALBP-1%29%20with%20Machine%20and%20Worker%20Constraints.pdf
http://umpir.ump.edu.my/id/eprint/19721/2/Modelling%20of%20Simple%20Assembly%20Line%20Balancing%20Problem%20Type%201%20%28SALBP-1%29%20with%20Machine%20and%20Worker%20Constraints%201.pdf
http://umpir.ump.edu.my/id/eprint/19721/
https://confseries.wixsite.com/guest2017
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
English
Description
Summary:This paper presents a mathematical model for Simple Assembly Line Problem Type 1 (SALBP-1) with resource constraints; machine and worker. The existing model of SALBP-1 assumes that all the workstations have similar capability, while in reality the workstation has different capability because of limitation in term of machines and worker skills. The proposed model is aimed to mathematically represent the SALBP-1 with resource constraints. Besides that, three objective functions which to minimize number of workstation, machine used and number of worker are also presented. The machine considered to have different types of machine needed to produce a product in an assembly line while worker are considered to have different abilities and skills. The model is then illustrated and validated using some examples. The proposed model for SALBP-1 with machine and worker constraints is able to minimize the resources in assembly. Therefore, the assembly cost can be reduced.