Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry

Assembly Line Balancing (ALB) plays a vital function especially in the production line. The installation of an assembly line is a long-term decision and requires large capital of investments. It is important that such a system is designed and balanced so that it able to work efficiently as possible....

Full description

Saved in:
Bibliographic Details
Main Authors: Muhammad Razif, Abdullah Make, M. F. F., Ab Rashid, Muhamad Magffierah, Razali, Manugari, Perumal
Format: Article
Language:English
Published: Faculty of Mechanical Engineering, Universiti Teknologi MARA (UiTM), Malaysia. 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/22900/1/2017%20ALB%20Razif%20JMECHE.pdf
http://umpir.ump.edu.my/id/eprint/22900/
http://jmeche.uitm.edu.my/browse-journals/special-issues/special-issue-2017-volume-4-2/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
id my.ump.umpir.22900
record_format eprints
spelling my.ump.umpir.229002018-12-05T02:27:33Z http://umpir.ump.edu.my/id/eprint/22900/ Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry Muhammad Razif, Abdullah Make M. F. F., Ab Rashid Muhamad Magffierah, Razali Manugari, Perumal TS Manufactures Assembly Line Balancing (ALB) plays a vital function especially in the production line. The installation of an assembly line is a long-term decision and requires large capital of investments. It is important that such a system is designed and balanced so that it able to work efficiently as possible. Many previous researches have proposed different heuristic approach in optimizing the assembly line. However little attention is given toward simulation analysis as proved of the proposed method. In this paper, a real industrial data of simple ALB problem is optimized and simulated for minimizing the number of workstation. Three proposed heuristics in order to improve the efficiency of the production are reviewed before a discrete simulation approach is used to compare the optimized performance. The anticipated performance of computational result is obtained from the problem comprising the workstation and labour performance output. Faculty of Mechanical Engineering, Universiti Teknologi MARA (UiTM), Malaysia. 2017 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/22900/1/2017%20ALB%20Razif%20JMECHE.pdf Muhammad Razif, Abdullah Make and M. F. F., Ab Rashid and Muhamad Magffierah, Razali and Manugari, Perumal (2017) Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry. Journal of Mechanical Engineering, SI 4 (2). pp. 171-185. ISSN 1823-5514 http://jmeche.uitm.edu.my/browse-journals/special-issues/special-issue-2017-volume-4-2/
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
Muhammad Razif, Abdullah Make
M. F. F., Ab Rashid
Muhamad Magffierah, Razali
Manugari, Perumal
Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
description Assembly Line Balancing (ALB) plays a vital function especially in the production line. The installation of an assembly line is a long-term decision and requires large capital of investments. It is important that such a system is designed and balanced so that it able to work efficiently as possible. Many previous researches have proposed different heuristic approach in optimizing the assembly line. However little attention is given toward simulation analysis as proved of the proposed method. In this paper, a real industrial data of simple ALB problem is optimized and simulated for minimizing the number of workstation. Three proposed heuristics in order to improve the efficiency of the production are reviewed before a discrete simulation approach is used to compare the optimized performance. The anticipated performance of computational result is obtained from the problem comprising the workstation and labour performance output.
format Article
author Muhammad Razif, Abdullah Make
M. F. F., Ab Rashid
Muhamad Magffierah, Razali
Manugari, Perumal
author_facet Muhammad Razif, Abdullah Make
M. F. F., Ab Rashid
Muhamad Magffierah, Razali
Manugari, Perumal
author_sort Muhammad Razif, Abdullah Make
title Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
title_short Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
title_full Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
title_fullStr Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
title_full_unstemmed Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
title_sort assembly line balancing using heuristic approaches in manufacturing industry
publisher Faculty of Mechanical Engineering, Universiti Teknologi MARA (UiTM), Malaysia.
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/22900/1/2017%20ALB%20Razif%20JMECHE.pdf
http://umpir.ump.edu.my/id/eprint/22900/
http://jmeche.uitm.edu.my/browse-journals/special-issues/special-issue-2017-volume-4-2/
_version_ 1643669466423230464