The barriers factors and driving forces for BIM implementation in Malaysian AEC companies
The emergence of high technology in the built environment industry has caused BIM (Building Information Modelling) to become one of the processes that are sought by the construction industry players to enhance and improves the project lifecycle. Previous research showed that BIM implementation had g...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Institute of Advanced Scientific Research, Inc.
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26099/1/The%20barriers%20factors%20and%20driving%20forces%20for%20BIM%20implementation%20.pdf http://umpir.ump.edu.my/id/eprint/26099/ http://www.jardcs.org/abstract.php?id=1951# |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English |
id |
my.ump.umpir.26099 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.260992019-10-18T02:43:59Z http://umpir.ump.edu.my/id/eprint/26099/ The barriers factors and driving forces for BIM implementation in Malaysian AEC companies Farah Salwati, Ibrahim Nur Diyana, Shariff Muneera, Isa Abdul Rahimi, Abdul Rahman GB Physical geography TA Engineering (General). Civil engineering (General) TH Building construction The emergence of high technology in the built environment industry has caused BIM (Building Information Modelling) to become one of the processes that are sought by the construction industry players to enhance and improves the project lifecycle. Previous research showed that BIM implementation had given positive impact to the return of investment (ROI), productivity, lessen disputes between the construction players, saving in construction cost and decrease the risk of project delay which crucial in delivering a project on time. However, the vast majority of AEC companies not interested in BIM because of obstacles and barriers that they need to face in the process of adopting BIM practice. Due to that, this study focusses on investigating the barriers factors in BIM implementation by Malaysian AEC construction industry and identifying the driving forces available to overcome the BIM implementation issues in Malaysia. This study used a questionnaire survey approach for data collection and analyzed it using SPSS. As a result, the critical barrier factors faced by Malaysian AEC companies such as organization cultures, technology, and government recognition are identified. Meanwhile, in term of driven forces to overcome the BIM implementation issues, proper BIM guidelines or standard for BIM requirement has been identified as a crucial factor for successful implementation. Furthermore, BIM Fund also has been found as one of the driven forces for successful BIM implementation where it can help the AEC companies to cover the cost for training, consultancy services, software purchase and hardware for business and project. Drawn specifically within the Malaysian AEC companies in Penang and Kuala Lumpur, these findings provide a basis for fostering the implementation of BIM practice for better project performance. Institute of Advanced Scientific Research, Inc. 2019 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/26099/1/The%20barriers%20factors%20and%20driving%20forces%20for%20BIM%20implementation%20.pdf Farah Salwati, Ibrahim and Nur Diyana, Shariff and Muneera, Isa and Abdul Rahimi, Abdul Rahman (2019) The barriers factors and driving forces for BIM implementation in Malaysian AEC companies. Journal of Advanced Research in Dynamical and Control Systems, 11 (8 special). pp. 275-281. ISSN 1943-023X http://www.jardcs.org/abstract.php?id=1951# |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
GB Physical geography TA Engineering (General). Civil engineering (General) TH Building construction |
spellingShingle |
GB Physical geography TA Engineering (General). Civil engineering (General) TH Building construction Farah Salwati, Ibrahim Nur Diyana, Shariff Muneera, Isa Abdul Rahimi, Abdul Rahman The barriers factors and driving forces for BIM implementation in Malaysian AEC companies |
description |
The emergence of high technology in the built environment industry has caused BIM (Building Information Modelling) to become one of the processes that are sought by the construction industry players to enhance and improves the project lifecycle. Previous research showed that BIM implementation had given positive impact to the return of investment (ROI), productivity, lessen disputes between the construction players, saving in construction cost and decrease the risk of project delay which crucial in delivering a project on time. However, the vast majority of AEC companies not interested in BIM because of obstacles and barriers that they need to face in the process of adopting BIM practice. Due to that, this study focusses on investigating the barriers factors in BIM implementation by Malaysian AEC construction industry and identifying the driving forces available to overcome the BIM implementation issues in Malaysia. This study used a questionnaire survey approach for data collection and analyzed it using SPSS. As a result, the critical barrier factors faced by Malaysian AEC companies such as organization cultures, technology, and government recognition are identified. Meanwhile, in term of driven forces to overcome the BIM implementation issues, proper BIM guidelines or standard for BIM requirement has been identified as a crucial factor for successful implementation. Furthermore, BIM Fund also has been found as one of the driven forces for successful BIM implementation where it can help the AEC companies to cover the cost for training, consultancy services, software purchase and hardware for business and project. Drawn specifically within the Malaysian AEC companies in Penang and Kuala Lumpur, these findings provide a basis for fostering the implementation of BIM practice for better project performance. |
format |
Article |
author |
Farah Salwati, Ibrahim Nur Diyana, Shariff Muneera, Isa Abdul Rahimi, Abdul Rahman |
author_facet |
Farah Salwati, Ibrahim Nur Diyana, Shariff Muneera, Isa Abdul Rahimi, Abdul Rahman |
author_sort |
Farah Salwati, Ibrahim |
title |
The barriers factors and driving forces for BIM implementation in Malaysian AEC companies |
title_short |
The barriers factors and driving forces for BIM implementation in Malaysian AEC companies |
title_full |
The barriers factors and driving forces for BIM implementation in Malaysian AEC companies |
title_fullStr |
The barriers factors and driving forces for BIM implementation in Malaysian AEC companies |
title_full_unstemmed |
The barriers factors and driving forces for BIM implementation in Malaysian AEC companies |
title_sort |
barriers factors and driving forces for bim implementation in malaysian aec companies |
publisher |
Institute of Advanced Scientific Research, Inc. |
publishDate |
2019 |
url |
http://umpir.ump.edu.my/id/eprint/26099/1/The%20barriers%20factors%20and%20driving%20forces%20for%20BIM%20implementation%20.pdf http://umpir.ump.edu.my/id/eprint/26099/ http://www.jardcs.org/abstract.php?id=1951# |
_version_ |
1648741254671892480 |