Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing
The hydrokinetic system is an electromechanical device that has been used to harness the electricity in the river stream or marine environment. The system is considered as a promising renewable energy resource especially at the remote areas near to the river. This paper presents the results of the s...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Springer Singapore
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/27814/1/Micro-Hydro%20Energy%20Estimation%20for%20Hydrokinetic1.pdf http://umpir.ump.edu.my/id/eprint/27814/ https://doi.org/10.1007/978-981-13-3708-6_49 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English |
id |
my.ump.umpir.27814 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.278142020-07-08T03:43:24Z http://umpir.ump.edu.my/id/eprint/27814/ Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing Wan Ismail, Ibrahim Raja Mohd Taufika, Raja Ismail Mohamed, Mohd Rusllim TK Electrical engineering. Electronics Nuclear engineering The hydrokinetic system is an electromechanical device that has been used to harness the electricity in the river stream or marine environment. The system is considered as a promising renewable energy resource especially at the remote areas near to the river. This paper presents the results of the site investigation on the hydrokinetic potential at Pasir Kubur River, Sungai Lembing Kuantan. From the analysis, it is shown that from the sampling measurement, the average water velocity is 1.1 m/s while the depth at the Station 2 is ranging between 0.55 and 5.0 m. The estimated output power is between 200 and 500 W depending on water velocity (V) and the swept area (A) of the turbines. Consequently, based on these results, the total annual energy yield can be achieved between 1.8 up to 4 MWh at the average water velocity of 1.1 m/s with 1.0 and 1.5 m2 turbines swept area respectively. Springer Singapore 2019-03-16 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/27814/1/Micro-Hydro%20Energy%20Estimation%20for%20Hydrokinetic1.pdf Wan Ismail, Ibrahim and Raja Mohd Taufika, Raja Ismail and Mohamed, Mohd Rusllim (2019) Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing. In: Proceedings of the 10th National Technical Seminar on Underwater System Technology 2018, 27-28 September 2018 , Universiti Malaysia Pahang. pp. 549-562., 13. ISBN 978-981-13-3707-9 https://doi.org/10.1007/978-981-13-3708-6_49 10.1007/978-981-13-3708-6 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TK Electrical engineering. Electronics Nuclear engineering Wan Ismail, Ibrahim Raja Mohd Taufika, Raja Ismail Mohamed, Mohd Rusllim Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing |
description |
The hydrokinetic system is an electromechanical device that has been used to harness the electricity in the river stream or marine environment. The system is considered as a promising renewable energy resource especially at the remote areas near to the river. This paper presents the results of the site investigation on the hydrokinetic potential at Pasir Kubur River, Sungai Lembing Kuantan. From the
analysis, it is shown that from the sampling measurement, the average water velocity is 1.1 m/s while the depth at the Station 2 is ranging between 0.55 and 5.0 m. The estimated output power is between 200 and 500 W depending on water velocity (V) and the swept area (A) of the turbines. Consequently, based on these results, the total annual energy yield can be achieved between 1.8 up to 4 MWh at the average water velocity of 1.1 m/s with 1.0 and 1.5 m2 turbines swept area respectively. |
format |
Conference or Workshop Item |
author |
Wan Ismail, Ibrahim Raja Mohd Taufika, Raja Ismail Mohamed, Mohd Rusllim |
author_facet |
Wan Ismail, Ibrahim Raja Mohd Taufika, Raja Ismail Mohamed, Mohd Rusllim |
author_sort |
Wan Ismail, Ibrahim |
title |
Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing |
title_short |
Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing |
title_full |
Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing |
title_fullStr |
Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing |
title_full_unstemmed |
Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing |
title_sort |
micro-hydro energy estimation for hydrokinetic energy harnessing at sungai lembing |
publisher |
Springer Singapore |
publishDate |
2019 |
url |
http://umpir.ump.edu.my/id/eprint/27814/1/Micro-Hydro%20Energy%20Estimation%20for%20Hydrokinetic1.pdf http://umpir.ump.edu.my/id/eprint/27814/ https://doi.org/10.1007/978-981-13-3708-6_49 |
_version_ |
1672610889138700288 |