Effect of mismanagement towards abandoned project in Malaysia
Over the years, Malaysian government has placed significant emphasis on the need for citizens to have their own house. Unfortunately, the abandoned housing projects are indeed a major hiccup for purchasers who dreams to have their own home become reality. The abandonment of housing projects has resu...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
IOP Publishing
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/28666/1/Effect%20of%20mismanagement%20towards%20abandoned%20project%20in%20Malaysia.pdf http://umpir.ump.edu.my/id/eprint/28666/ https://doi.org/10.1088/1757-899X/849/1/012004 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English |
id |
my.ump.umpir.28666 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.286662022-01-07T08:16:22Z http://umpir.ump.edu.my/id/eprint/28666/ Effect of mismanagement towards abandoned project in Malaysia Saidah An'nisaa, Salam Nur Farhayu, Ariffin N. F. N., Mohamad Noor Mohammad Idris, Ali N. I., Ramli TH Building construction Over the years, Malaysian government has placed significant emphasis on the need for citizens to have their own house. Unfortunately, the abandoned housing projects are indeed a major hiccup for purchasers who dreams to have their own home become reality. The abandonment of housing projects has resulted in many adverse consequences to the economy, society and environment. Therefore, this paper discuss on the effects of mismanagement in contribution to the abandoned housing project. Together, the suitable solutions to mitigate the abandonment issues will also be proposed. The studies focus on collecting the data form local authorities and also by doing a questionnaire. The data was analyse based on the Likert's scale and using relative of important index. This study found that the mismanagement is cause by the inexperienced developer with lack of management skill will contribute to the abandoned housing project. IOP Publishing 2020-05-29 Conference or Workshop Item PeerReviewed pdf en cc_by http://umpir.ump.edu.my/id/eprint/28666/1/Effect%20of%20mismanagement%20towards%20abandoned%20project%20in%20Malaysia.pdf Saidah An'nisaa, Salam and Nur Farhayu, Ariffin and N. F. N., Mohamad Noor and Mohammad Idris, Ali and N. I., Ramli (2020) Effect of mismanagement towards abandoned project in Malaysia. In: IOP Conference Series: Materials Science and Engineering; 4th International Conference on Construction and Building Engineering and 12th Regional Conference in Civil Engineering, ICONBUILD and RCCE 2019, 20 - 22 August 2019 , Langkawi, Malaysia. pp. 1-9., 849 (1). ISSN 1757-8981 (Print), 1757-899X (Online) https://doi.org/10.1088/1757-899X/849/1/012004 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Saidah An'nisaa, Salam Nur Farhayu, Ariffin N. F. N., Mohamad Noor Mohammad Idris, Ali N. I., Ramli Effect of mismanagement towards abandoned project in Malaysia |
description |
Over the years, Malaysian government has placed significant emphasis on the need for citizens to have their own house. Unfortunately, the abandoned housing projects are indeed a major hiccup for purchasers who dreams to have their own home become reality. The abandonment of housing projects has resulted in many adverse consequences to the economy, society and environment. Therefore, this paper discuss on the effects of mismanagement in contribution to the abandoned housing project. Together, the suitable solutions to mitigate the abandonment issues will also be proposed. The studies focus on collecting the data form local authorities and also by doing a questionnaire. The data was analyse based on the Likert's scale and using relative of important index. This study found that the mismanagement is cause by the inexperienced developer with lack of management skill will contribute to the abandoned housing project. |
format |
Conference or Workshop Item |
author |
Saidah An'nisaa, Salam Nur Farhayu, Ariffin N. F. N., Mohamad Noor Mohammad Idris, Ali N. I., Ramli |
author_facet |
Saidah An'nisaa, Salam Nur Farhayu, Ariffin N. F. N., Mohamad Noor Mohammad Idris, Ali N. I., Ramli |
author_sort |
Saidah An'nisaa, Salam |
title |
Effect of mismanagement towards abandoned project in Malaysia |
title_short |
Effect of mismanagement towards abandoned project in Malaysia |
title_full |
Effect of mismanagement towards abandoned project in Malaysia |
title_fullStr |
Effect of mismanagement towards abandoned project in Malaysia |
title_full_unstemmed |
Effect of mismanagement towards abandoned project in Malaysia |
title_sort |
effect of mismanagement towards abandoned project in malaysia |
publisher |
IOP Publishing |
publishDate |
2020 |
url |
http://umpir.ump.edu.my/id/eprint/28666/1/Effect%20of%20mismanagement%20towards%20abandoned%20project%20in%20Malaysia.pdf http://umpir.ump.edu.my/id/eprint/28666/ https://doi.org/10.1088/1757-899X/849/1/012004 |
_version_ |
1724073479498629120 |