Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects

While all project parties agree that exceeding the budget results in project failures, most construction projects in Jordan are suffering from cost overruns. Understanding the root cause of the issue is critical to solve the problem comprehensively. However, the previous studies lack information on...

Full description

Saved in:
Bibliographic Details
Main Authors: Faten, Ahmad Albtoush, Doh, Shu Ing, Abdul Rahimi, Abdul Rahman
Format: Conference or Workshop Item
Language:English
English
Published: 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/30378/1/16.%20Underlying%20factors%20of%20cost%20overruns%20in%20developing%20countries.pdf
http://umpir.ump.edu.my/id/eprint/30378/2/16.1%20Underlying%20factors%20of%20cost%20overruns%20in%20developing%20countries.pdf
http://umpir.ump.edu.my/id/eprint/30378/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang Al-Sultan Abdullah
Language: English
English
id my.ump.umpir.30378
record_format eprints
spelling my.ump.umpir.303782021-01-06T04:27:16Z http://umpir.ump.edu.my/id/eprint/30378/ Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects Faten, Ahmad Albtoush Doh, Shu Ing Abdul Rahimi, Abdul Rahman TA Engineering (General). Civil engineering (General) While all project parties agree that exceeding the budget results in project failures, most construction projects in Jordan are suffering from cost overruns. Understanding the root cause of the issue is critical to solve the problem comprehensively. However, the previous studies lack information on the underlying causes that are resulting in cost overruns among the nation’s construction projects. The principal purpose of this study is to identify the most significant causes of cost overruns in Jordanian construction projects. Therefore, the researcher used the quantitative approach for data collection through questionnaire survey among stakeholders in the construction project. This study uses the principles of multivariate statistics in analyzing the causes of cost overruns in Jordanian construction projects. The findings revealed that the four major underlying causes for cost overruns in Jordan are financial difficulties, materials issues, design issues and additional works. Besides, the results also revealed that high transportation cost, unrealistic contract duration, slow decision making, extra quantity during construction, inadequate funds for project financing, inconsistent cash flows and payment problems faced by the clients from the government are critical sub cause for cost overruns in the region. The findings on the critical and underlying causes for cost overruns may help industrial practitioners in developing strategies to achieve better project success. 2020-10 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/30378/1/16.%20Underlying%20factors%20of%20cost%20overruns%20in%20developing%20countries.pdf pdf en http://umpir.ump.edu.my/id/eprint/30378/2/16.1%20Underlying%20factors%20of%20cost%20overruns%20in%20developing%20countries.pdf Faten, Ahmad Albtoush and Doh, Shu Ing and Abdul Rahimi, Abdul Rahman (2020) Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects. In: 4th National Conference on Wind and Earthquake Engineering (NCWE 2020), 16 Oct & 17 Oct 2020 , Virtual Conference. pp. 1-17..
institution Universiti Malaysia Pahang Al-Sultan Abdullah
building UMPSA Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Faten, Ahmad Albtoush
Doh, Shu Ing
Abdul Rahimi, Abdul Rahman
Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects
description While all project parties agree that exceeding the budget results in project failures, most construction projects in Jordan are suffering from cost overruns. Understanding the root cause of the issue is critical to solve the problem comprehensively. However, the previous studies lack information on the underlying causes that are resulting in cost overruns among the nation’s construction projects. The principal purpose of this study is to identify the most significant causes of cost overruns in Jordanian construction projects. Therefore, the researcher used the quantitative approach for data collection through questionnaire survey among stakeholders in the construction project. This study uses the principles of multivariate statistics in analyzing the causes of cost overruns in Jordanian construction projects. The findings revealed that the four major underlying causes for cost overruns in Jordan are financial difficulties, materials issues, design issues and additional works. Besides, the results also revealed that high transportation cost, unrealistic contract duration, slow decision making, extra quantity during construction, inadequate funds for project financing, inconsistent cash flows and payment problems faced by the clients from the government are critical sub cause for cost overruns in the region. The findings on the critical and underlying causes for cost overruns may help industrial practitioners in developing strategies to achieve better project success.
format Conference or Workshop Item
author Faten, Ahmad Albtoush
Doh, Shu Ing
Abdul Rahimi, Abdul Rahman
author_facet Faten, Ahmad Albtoush
Doh, Shu Ing
Abdul Rahimi, Abdul Rahman
author_sort Faten, Ahmad Albtoush
title Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects
title_short Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects
title_full Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects
title_fullStr Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects
title_full_unstemmed Underlying factors of cost overruns in developing countries: multivariate analysis of Jordanian projects
title_sort underlying factors of cost overruns in developing countries: multivariate analysis of jordanian projects
publishDate 2020
url http://umpir.ump.edu.my/id/eprint/30378/1/16.%20Underlying%20factors%20of%20cost%20overruns%20in%20developing%20countries.pdf
http://umpir.ump.edu.my/id/eprint/30378/2/16.1%20Underlying%20factors%20of%20cost%20overruns%20in%20developing%20countries.pdf
http://umpir.ump.edu.my/id/eprint/30378/
_version_ 1822921849012486144