The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
This paper presents a real-world, capacitated examination timetabling problem from Universiti Malaysia Pahang (UMP), Malaysia. The problem has constraints which have not been modelled before, these being the distance between examination rooms and splitting exams across several rooms. These constrain...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English English |
Published: |
Science Direct
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/33571/1/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang_%20FULL.pdf http://umpir.ump.edu.my/id/eprint/33571/2/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang.pdf http://umpir.ump.edu.my/id/eprint/33571/ https://doi.org/10.1016/j.ejor.2010.04.011 https://doi.org/10.1016/j.ejor.2010.04.011 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English English |
Be the first to leave a comment!