Stakeholder management in public sector infrastructure projects
The underlying risks and complexities in government infrastructure projects have increased the importance of external stakeholder management in contemporary project management. In developing countries, it is also important for policymaking and planning of infrastructure programs due to the varying n...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Engineering Project and Production Management
2022
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/34612/1/Stakeholder%20management%20in%20public%20sector%20infrastructure%20projects.pdf http://umpir.ump.edu.my/id/eprint/34612/ https://doi.org/10.32738/JEPPM-2022-0017 https://doi.org/10.32738/JEPPM-2022-0017 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English |
id |
my.ump.umpir.34612 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.346122022-11-15T04:06:55Z http://umpir.ump.edu.my/id/eprint/34612/ Stakeholder management in public sector infrastructure projects Muhammad, Waris Khan, Asadullah Abideen, Ahmed Zainul Sorooshian, Shahryar Ullah, Mehfooz HD28 Management. Industrial Management T Technology (General) The underlying risks and complexities in government infrastructure projects have increased the importance of external stakeholder management in contemporary project management. In developing countries, it is also important for policymaking and planning of infrastructure programs due to the varying nature of stakeholders and their expectations from the government. Few studies have looked at how external stakeholders are involved in public infrastructure projects and how they work together to achieve common project goals by overcoming communication and decision-making barriers. The internal stakeholders and project managers also need to properly liaise with the external stakeholders without compromising the project goals. Thus, there is a need to strategize the stakeholder management process to improve public sector infrastructure projects, especially from a developing nation's perspective. Therefore, the scope of this research has evaluated the prevalence of external stakeholder management in public sector infrastructure construction projects in Pakistan by developing and validating its five core dimensions. Among the constructs were identification and classification, communication, engagement, empowerment, and risk control. Besides this, twenty-seven sub-variables of stakeholder management have also been identified in the context of public sector projects. The results of the factor loading show that "Risk Control" is the most contributing dimension of stakeholder management, and "Empowerment" is the least concern in the current practices. The study emphasizes the importance of establishing a systematic and comprehensive framework for empowering external stakeholders, which will strengthen and improve performance and project outcomes. This study reveals insights that will assist project organizations in integrating external stakeholders into their government-sponsored projects with their effective empowerment and sufficient engagement. Engineering Project and Production Management 2022-09 Article PeerReviewed pdf en cc_by_nc_nd http://umpir.ump.edu.my/id/eprint/34612/1/Stakeholder%20management%20in%20public%20sector%20infrastructure%20projects.pdf Muhammad, Waris and Khan, Asadullah and Abideen, Ahmed Zainul and Sorooshian, Shahryar and Ullah, Mehfooz (2022) Stakeholder management in public sector infrastructure projects. Journal of Engineering, Project, and Production Management, 12 (3). pp. 188-201. ISSN 2221-6529 https://doi.org/10.32738/JEPPM-2022-0017 https://doi.org/10.32738/JEPPM-2022-0017 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
HD28 Management. Industrial Management T Technology (General) |
spellingShingle |
HD28 Management. Industrial Management T Technology (General) Muhammad, Waris Khan, Asadullah Abideen, Ahmed Zainul Sorooshian, Shahryar Ullah, Mehfooz Stakeholder management in public sector infrastructure projects |
description |
The underlying risks and complexities in government infrastructure projects have increased the importance of external stakeholder management in contemporary project management. In developing countries, it is also important for policymaking and planning of infrastructure programs due to the varying nature of stakeholders and their expectations from the government. Few studies have looked at how external stakeholders are involved in public infrastructure projects and how they work together to achieve common project goals by overcoming communication and decision-making barriers. The internal stakeholders and project managers also need to properly liaise with the external stakeholders without compromising the project goals. Thus, there is a need to strategize the stakeholder management process to improve public sector infrastructure projects, especially from a developing nation's perspective. Therefore, the scope of this research has evaluated the prevalence of external stakeholder management in public sector infrastructure construction projects in Pakistan by developing and validating its five core dimensions. Among the constructs were identification and classification, communication, engagement, empowerment, and risk control. Besides this, twenty-seven sub-variables of stakeholder management have also been identified in the context of public sector projects. The results of the factor loading show that "Risk Control" is the most contributing dimension of stakeholder management, and "Empowerment" is the least concern in the current practices. The study emphasizes the importance of establishing a systematic and comprehensive framework for empowering external stakeholders, which will strengthen and improve performance and project outcomes. This study reveals insights that will assist project organizations in integrating external stakeholders into their government-sponsored projects with their effective empowerment and sufficient engagement. |
format |
Article |
author |
Muhammad, Waris Khan, Asadullah Abideen, Ahmed Zainul Sorooshian, Shahryar Ullah, Mehfooz |
author_facet |
Muhammad, Waris Khan, Asadullah Abideen, Ahmed Zainul Sorooshian, Shahryar Ullah, Mehfooz |
author_sort |
Muhammad, Waris |
title |
Stakeholder management in public sector infrastructure projects |
title_short |
Stakeholder management in public sector infrastructure projects |
title_full |
Stakeholder management in public sector infrastructure projects |
title_fullStr |
Stakeholder management in public sector infrastructure projects |
title_full_unstemmed |
Stakeholder management in public sector infrastructure projects |
title_sort |
stakeholder management in public sector infrastructure projects |
publisher |
Engineering Project and Production Management |
publishDate |
2022 |
url |
http://umpir.ump.edu.my/id/eprint/34612/1/Stakeholder%20management%20in%20public%20sector%20infrastructure%20projects.pdf http://umpir.ump.edu.my/id/eprint/34612/ https://doi.org/10.32738/JEPPM-2022-0017 https://doi.org/10.32738/JEPPM-2022-0017 |
_version_ |
1751536375866327040 |