Stakeholder management in public sector infrastructure projects

The underlying risks and complexities in government infrastructure projects have increased the importance of external stakeholder management in contemporary project management. In developing countries, it is also important for policymaking and planning of infrastructure programs due to the varying n...

Full description

Saved in:
Bibliographic Details
Main Authors: Muhammad, Waris, Khan, Asadullah, Abideen, Ahmed Zainul, Sorooshian, Shahryar, Ullah, Mehfooz
Format: Article
Language:English
Published: Engineering Project and Production Management 2022
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/34612/1/Stakeholder%20management%20in%20public%20sector%20infrastructure%20projects.pdf
http://umpir.ump.edu.my/id/eprint/34612/
https://doi.org/10.32738/JEPPM-2022-0017
https://doi.org/10.32738/JEPPM-2022-0017
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
id my.ump.umpir.34612
record_format eprints
spelling my.ump.umpir.346122022-11-15T04:06:55Z http://umpir.ump.edu.my/id/eprint/34612/ Stakeholder management in public sector infrastructure projects Muhammad, Waris Khan, Asadullah Abideen, Ahmed Zainul Sorooshian, Shahryar Ullah, Mehfooz HD28 Management. Industrial Management T Technology (General) The underlying risks and complexities in government infrastructure projects have increased the importance of external stakeholder management in contemporary project management. In developing countries, it is also important for policymaking and planning of infrastructure programs due to the varying nature of stakeholders and their expectations from the government. Few studies have looked at how external stakeholders are involved in public infrastructure projects and how they work together to achieve common project goals by overcoming communication and decision-making barriers. The internal stakeholders and project managers also need to properly liaise with the external stakeholders without compromising the project goals. Thus, there is a need to strategize the stakeholder management process to improve public sector infrastructure projects, especially from a developing nation's perspective. Therefore, the scope of this research has evaluated the prevalence of external stakeholder management in public sector infrastructure construction projects in Pakistan by developing and validating its five core dimensions. Among the constructs were identification and classification, communication, engagement, empowerment, and risk control. Besides this, twenty-seven sub-variables of stakeholder management have also been identified in the context of public sector projects. The results of the factor loading show that "Risk Control" is the most contributing dimension of stakeholder management, and "Empowerment" is the least concern in the current practices. The study emphasizes the importance of establishing a systematic and comprehensive framework for empowering external stakeholders, which will strengthen and improve performance and project outcomes. This study reveals insights that will assist project organizations in integrating external stakeholders into their government-sponsored projects with their effective empowerment and sufficient engagement. Engineering Project and Production Management 2022-09 Article PeerReviewed pdf en cc_by_nc_nd http://umpir.ump.edu.my/id/eprint/34612/1/Stakeholder%20management%20in%20public%20sector%20infrastructure%20projects.pdf Muhammad, Waris and Khan, Asadullah and Abideen, Ahmed Zainul and Sorooshian, Shahryar and Ullah, Mehfooz (2022) Stakeholder management in public sector infrastructure projects. Journal of Engineering, Project, and Production Management, 12 (3). pp. 188-201. ISSN 2221-6529 https://doi.org/10.32738/JEPPM-2022-0017 https://doi.org/10.32738/JEPPM-2022-0017
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic HD28 Management. Industrial Management
T Technology (General)
spellingShingle HD28 Management. Industrial Management
T Technology (General)
Muhammad, Waris
Khan, Asadullah
Abideen, Ahmed Zainul
Sorooshian, Shahryar
Ullah, Mehfooz
Stakeholder management in public sector infrastructure projects
description The underlying risks and complexities in government infrastructure projects have increased the importance of external stakeholder management in contemporary project management. In developing countries, it is also important for policymaking and planning of infrastructure programs due to the varying nature of stakeholders and their expectations from the government. Few studies have looked at how external stakeholders are involved in public infrastructure projects and how they work together to achieve common project goals by overcoming communication and decision-making barriers. The internal stakeholders and project managers also need to properly liaise with the external stakeholders without compromising the project goals. Thus, there is a need to strategize the stakeholder management process to improve public sector infrastructure projects, especially from a developing nation's perspective. Therefore, the scope of this research has evaluated the prevalence of external stakeholder management in public sector infrastructure construction projects in Pakistan by developing and validating its five core dimensions. Among the constructs were identification and classification, communication, engagement, empowerment, and risk control. Besides this, twenty-seven sub-variables of stakeholder management have also been identified in the context of public sector projects. The results of the factor loading show that "Risk Control" is the most contributing dimension of stakeholder management, and "Empowerment" is the least concern in the current practices. The study emphasizes the importance of establishing a systematic and comprehensive framework for empowering external stakeholders, which will strengthen and improve performance and project outcomes. This study reveals insights that will assist project organizations in integrating external stakeholders into their government-sponsored projects with their effective empowerment and sufficient engagement.
format Article
author Muhammad, Waris
Khan, Asadullah
Abideen, Ahmed Zainul
Sorooshian, Shahryar
Ullah, Mehfooz
author_facet Muhammad, Waris
Khan, Asadullah
Abideen, Ahmed Zainul
Sorooshian, Shahryar
Ullah, Mehfooz
author_sort Muhammad, Waris
title Stakeholder management in public sector infrastructure projects
title_short Stakeholder management in public sector infrastructure projects
title_full Stakeholder management in public sector infrastructure projects
title_fullStr Stakeholder management in public sector infrastructure projects
title_full_unstemmed Stakeholder management in public sector infrastructure projects
title_sort stakeholder management in public sector infrastructure projects
publisher Engineering Project and Production Management
publishDate 2022
url http://umpir.ump.edu.my/id/eprint/34612/1/Stakeholder%20management%20in%20public%20sector%20infrastructure%20projects.pdf
http://umpir.ump.edu.my/id/eprint/34612/
https://doi.org/10.32738/JEPPM-2022-0017
https://doi.org/10.32738/JEPPM-2022-0017
_version_ 1751536375866327040