Underlying causes of construction project delay: A review
Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project is delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UMP
2022
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/36211/1/Underlying%20Causes%20of%20Construction%20Project%20Delay.pdf http://umpir.ump.edu.my/id/eprint/36211/ https://doi.org/10.15282/construction.v2i2.7775 https://doi.org/10.15282/construction.v2i2.7775 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English |
id |
my.ump.umpir.36211 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.362112023-01-03T02:12:45Z http://umpir.ump.edu.my/id/eprint/36211/ Underlying causes of construction project delay: A review Romzi, N. A. Doh, S. I. TA Engineering (General). Civil engineering (General) TH Building construction Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project is delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit from the project, they gain losses. Similarly, other construction projects in different countries are prone to face delays. The aim of this study is to summarise the causes of delay in the construction project from previous study. Regarding the causes of construction project delay, the major countries in the world have faced slow decision making, poor site management and supervision, shortage of labour, changes of scope of work during construction, late in revising and approving design documents, etc. The identification of important delay causes helps a contractor to plan well before the project start. Penerbit UMP 2022-12 Article PeerReviewed pdf en cc_by_4 http://umpir.ump.edu.my/id/eprint/36211/1/Underlying%20Causes%20of%20Construction%20Project%20Delay.pdf Romzi, N. A. and Doh, S. I. (2022) Underlying causes of construction project delay: A review. Construction, 2 (2). pp. 7-11. ISSN 2785-8731 https://doi.org/10.15282/construction.v2i2.7775 https://doi.org/10.15282/construction.v2i2.7775 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) TH Building construction |
spellingShingle |
TA Engineering (General). Civil engineering (General) TH Building construction Romzi, N. A. Doh, S. I. Underlying causes of construction project delay: A review |
description |
Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project is delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit from the project, they gain losses. Similarly, other construction projects in different countries are prone to face delays. The aim of this study is to summarise the causes of delay in the construction project from previous study. Regarding the causes of construction project delay, the major countries in the world have faced slow decision making, poor site management and supervision, shortage of labour, changes of scope of work during construction, late in revising and approving design documents, etc. The identification of important delay causes helps a contractor to plan well before the project start. |
format |
Article |
author |
Romzi, N. A. Doh, S. I. |
author_facet |
Romzi, N. A. Doh, S. I. |
author_sort |
Romzi, N. A. |
title |
Underlying causes of construction project delay: A review |
title_short |
Underlying causes of construction project delay: A review |
title_full |
Underlying causes of construction project delay: A review |
title_fullStr |
Underlying causes of construction project delay: A review |
title_full_unstemmed |
Underlying causes of construction project delay: A review |
title_sort |
underlying causes of construction project delay: a review |
publisher |
Penerbit UMP |
publishDate |
2022 |
url |
http://umpir.ump.edu.my/id/eprint/36211/1/Underlying%20Causes%20of%20Construction%20Project%20Delay.pdf http://umpir.ump.edu.my/id/eprint/36211/ https://doi.org/10.15282/construction.v2i2.7775 https://doi.org/10.15282/construction.v2i2.7775 |
_version_ |
1753971875123298304 |