Conceptual risk assessment for new township infrastructure expansion at Kuantan

This paper intends to contribute about the risk assessment on New Township located at Kuantan. Researchers found that, it has a lot of risk that will occur at that area. Researchers found that it have 5 possible risk like disease, flooding, traffic risk, soil erosion and the improper drainage system...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammad Affendy, Omardin, M. F., Ishak, N. F., Omar, K. J., Abd Hamid, F. Z., Mansur, Lau, P. D., N. A., Tutur, M., Mustafa, K., Mansor, Teo, M. Y., Lee, J. X.
Format: Article
Language:English
Published: Penerbit Universiti Malaysia Pahang 2023
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/38937/1/Conceptual%20Risk%20Assessment%20for%20New%20Township%20Infrastructure%20Expansion%20at%20Kuantan.pdf
http://umpir.ump.edu.my/id/eprint/38937/
https://doi.org/10.15282/ijets.10.1.2023.1002
https://doi.org/10.15282/ijets.10.1.2023.1002
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang Al-Sultan Abdullah
Language: English
id my.ump.umpir.38937
record_format eprints
spelling my.ump.umpir.389372023-10-19T08:00:44Z http://umpir.ump.edu.my/id/eprint/38937/ Conceptual risk assessment for new township infrastructure expansion at Kuantan Mohammad Affendy, Omardin M. F., Ishak N. F., Omar K. J., Abd Hamid F. Z., Mansur Lau, P. D. N. A., Tutur M., Mustafa K., Mansor Teo, M. Y. Lee, J. X. TA Engineering (General). Civil engineering (General) TD Environmental technology. Sanitary engineering TH Building construction This paper intends to contribute about the risk assessment on New Township located at Kuantan. Researchers found that, it has a lot of risk that will occur at that area. Researchers found that it have 5 possible risk like disease, flooding, traffic risk, soil erosion and the improper drainage system. Then, researchers will choose the top 3 major risk to do the risk assessment. So, researchers choose traffic risk, soil erosion and the improper drainage system as our major risk in this project. Lastly, researchers also have implement the solution to solve the risk. Penerbit Universiti Malaysia Pahang 2023-06 Article PeerReviewed pdf en cc_by_4 http://umpir.ump.edu.my/id/eprint/38937/1/Conceptual%20Risk%20Assessment%20for%20New%20Township%20Infrastructure%20Expansion%20at%20Kuantan.pdf Mohammad Affendy, Omardin and M. F., Ishak and N. F., Omar and K. J., Abd Hamid and F. Z., Mansur and Lau, P. D. and N. A., Tutur and M., Mustafa and K., Mansor and Teo, M. Y. and Lee, J. X. (2023) Conceptual risk assessment for new township infrastructure expansion at Kuantan. International Journal of Engineering Technology And Sciences (IJETS), 10 (1). pp. 7-15. ISSN 2289-697X. (Published) https://doi.org/10.15282/ijets.10.1.2023.1002 https://doi.org/10.15282/ijets.10.1.2023.1002
institution Universiti Malaysia Pahang Al-Sultan Abdullah
building UMPSA Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TA Engineering (General). Civil engineering (General)
TD Environmental technology. Sanitary engineering
TH Building construction
spellingShingle TA Engineering (General). Civil engineering (General)
TD Environmental technology. Sanitary engineering
TH Building construction
Mohammad Affendy, Omardin
M. F., Ishak
N. F., Omar
K. J., Abd Hamid
F. Z., Mansur
Lau, P. D.
N. A., Tutur
M., Mustafa
K., Mansor
Teo, M. Y.
Lee, J. X.
Conceptual risk assessment for new township infrastructure expansion at Kuantan
description This paper intends to contribute about the risk assessment on New Township located at Kuantan. Researchers found that, it has a lot of risk that will occur at that area. Researchers found that it have 5 possible risk like disease, flooding, traffic risk, soil erosion and the improper drainage system. Then, researchers will choose the top 3 major risk to do the risk assessment. So, researchers choose traffic risk, soil erosion and the improper drainage system as our major risk in this project. Lastly, researchers also have implement the solution to solve the risk.
format Article
author Mohammad Affendy, Omardin
M. F., Ishak
N. F., Omar
K. J., Abd Hamid
F. Z., Mansur
Lau, P. D.
N. A., Tutur
M., Mustafa
K., Mansor
Teo, M. Y.
Lee, J. X.
author_facet Mohammad Affendy, Omardin
M. F., Ishak
N. F., Omar
K. J., Abd Hamid
F. Z., Mansur
Lau, P. D.
N. A., Tutur
M., Mustafa
K., Mansor
Teo, M. Y.
Lee, J. X.
author_sort Mohammad Affendy, Omardin
title Conceptual risk assessment for new township infrastructure expansion at Kuantan
title_short Conceptual risk assessment for new township infrastructure expansion at Kuantan
title_full Conceptual risk assessment for new township infrastructure expansion at Kuantan
title_fullStr Conceptual risk assessment for new township infrastructure expansion at Kuantan
title_full_unstemmed Conceptual risk assessment for new township infrastructure expansion at Kuantan
title_sort conceptual risk assessment for new township infrastructure expansion at kuantan
publisher Penerbit Universiti Malaysia Pahang
publishDate 2023
url http://umpir.ump.edu.my/id/eprint/38937/1/Conceptual%20Risk%20Assessment%20for%20New%20Township%20Infrastructure%20Expansion%20at%20Kuantan.pdf
http://umpir.ump.edu.my/id/eprint/38937/
https://doi.org/10.15282/ijets.10.1.2023.1002
https://doi.org/10.15282/ijets.10.1.2023.1002
_version_ 1822923785118941184