Optimal nuclear trigeneration system considering life cycle costing

A nuclear reactor can generate a large amount of high-temperature waste heat, which can be recovered to produce simultaneous electricity, heating and cooling, known as a trigeneration system. Trigeneration System Cascade Analysis is a methodology based on Pinch Analysis to optimise a centralised tri...

Full description

Saved in:
Bibliographic Details
Main Authors: Khairulnadzmi, Jamaluddin, Sharifah Rafidah, Wan Alwi, Zainuddin, Abdul Manan, Khaidzir, Hamzah, Klemeš, Jiří Jaromír, Roziah, Zailan
Format: Article
Language:English
English
Published: Elsevier Ltd 2022
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/40190/1/Optimal%20nuclear%20trigeneration%20system%20considering%20life.pdf
http://umpir.ump.edu.my/id/eprint/40190/2/Optimal%20nuclear%20trigeneration%20system%20considering%20life%20cycle%20costing_ABS.pdf
http://umpir.ump.edu.my/id/eprint/40190/
https://doi.org/10.1016/j.jclepro.2022.133399
https://doi.org/10.1016/j.jclepro.2022.133399
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang Al-Sultan Abdullah
Language: English
English
id my.ump.umpir.40190
record_format eprints
spelling my.ump.umpir.401902024-02-08T06:41:31Z http://umpir.ump.edu.my/id/eprint/40190/ Optimal nuclear trigeneration system considering life cycle costing Khairulnadzmi, Jamaluddin Sharifah Rafidah, Wan Alwi Zainuddin, Abdul Manan Khaidzir, Hamzah Klemeš, Jiří Jaromír Roziah, Zailan T Technology (General) TA Engineering (General). Civil engineering (General) A nuclear reactor can generate a large amount of high-temperature waste heat, which can be recovered to produce simultaneous electricity, heating and cooling, known as a trigeneration system. Trigeneration System Cascade Analysis is a methodology based on Pinch Analysis to optimise a centralised trigeneration system in various energy ratings in demands. However, the previous study does not consider a complete life cycle costing in the Trigeneration System Cascade Analysis. The methodology consists of three main parts, which are data extraction, development of Trigeneration System Cascade Analysis, and calculations of the life cycle costing. In this analysis, a centralised Pressurised Water Reactor, which is the most commonly used nuclear reactor in the world, is applied in a trigeneration mode in three different industrial plants. Based on the results of the case study, an optimal Pressurised Water Reactor trigeneration system is obtained where the total thermal energy required is 1,102.25 MW or translated into 26.5 GWh/d. The Equivalent Annual Cost for the case study, on the other hand, showed the centralised Pressurised Water Reactor trigeneration system requires 1.89 × 1011 USD/y for maintaining, operating, constructing, and disposing of the overall Pressurised Water Reactor trigeneration system. The maintenance cost is the highest percentage which constitutes 51.3% of the overall cost. Comparisons between normal conditions, and planned and unplanned shutdowns are also conducted, and the results show that Equivalent Annual Costs of planned and unplanned shutdowns required an additional 1.4 MUSD and 0.5 MUSD to support the deficit energy during shutdowns. The implementation of the full life cycle costing during the normal conditions planned and unplanned shutdowns of the Pressurized Water Reactor trigeneration system gives a proper projection of the cash flows that can create an economic model that reflects all the project realisation conditions. Elsevier Ltd 2022-10-10 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/40190/1/Optimal%20nuclear%20trigeneration%20system%20considering%20life.pdf pdf en http://umpir.ump.edu.my/id/eprint/40190/2/Optimal%20nuclear%20trigeneration%20system%20considering%20life%20cycle%20costing_ABS.pdf Khairulnadzmi, Jamaluddin and Sharifah Rafidah, Wan Alwi and Zainuddin, Abdul Manan and Khaidzir, Hamzah and Klemeš, Jiří Jaromír and Roziah, Zailan (2022) Optimal nuclear trigeneration system considering life cycle costing. Journal of Cleaner Production, 370 (133399). pp. 1-20. ISSN 0959-6526. (Published) https://doi.org/10.1016/j.jclepro.2022.133399 https://doi.org/10.1016/j.jclepro.2022.133399
institution Universiti Malaysia Pahang Al-Sultan Abdullah
building UMPSA Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
English
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
Khairulnadzmi, Jamaluddin
Sharifah Rafidah, Wan Alwi
Zainuddin, Abdul Manan
Khaidzir, Hamzah
Klemeš, Jiří Jaromír
Roziah, Zailan
Optimal nuclear trigeneration system considering life cycle costing
description A nuclear reactor can generate a large amount of high-temperature waste heat, which can be recovered to produce simultaneous electricity, heating and cooling, known as a trigeneration system. Trigeneration System Cascade Analysis is a methodology based on Pinch Analysis to optimise a centralised trigeneration system in various energy ratings in demands. However, the previous study does not consider a complete life cycle costing in the Trigeneration System Cascade Analysis. The methodology consists of three main parts, which are data extraction, development of Trigeneration System Cascade Analysis, and calculations of the life cycle costing. In this analysis, a centralised Pressurised Water Reactor, which is the most commonly used nuclear reactor in the world, is applied in a trigeneration mode in three different industrial plants. Based on the results of the case study, an optimal Pressurised Water Reactor trigeneration system is obtained where the total thermal energy required is 1,102.25 MW or translated into 26.5 GWh/d. The Equivalent Annual Cost for the case study, on the other hand, showed the centralised Pressurised Water Reactor trigeneration system requires 1.89 × 1011 USD/y for maintaining, operating, constructing, and disposing of the overall Pressurised Water Reactor trigeneration system. The maintenance cost is the highest percentage which constitutes 51.3% of the overall cost. Comparisons between normal conditions, and planned and unplanned shutdowns are also conducted, and the results show that Equivalent Annual Costs of planned and unplanned shutdowns required an additional 1.4 MUSD and 0.5 MUSD to support the deficit energy during shutdowns. The implementation of the full life cycle costing during the normal conditions planned and unplanned shutdowns of the Pressurized Water Reactor trigeneration system gives a proper projection of the cash flows that can create an economic model that reflects all the project realisation conditions.
format Article
author Khairulnadzmi, Jamaluddin
Sharifah Rafidah, Wan Alwi
Zainuddin, Abdul Manan
Khaidzir, Hamzah
Klemeš, Jiří Jaromír
Roziah, Zailan
author_facet Khairulnadzmi, Jamaluddin
Sharifah Rafidah, Wan Alwi
Zainuddin, Abdul Manan
Khaidzir, Hamzah
Klemeš, Jiří Jaromír
Roziah, Zailan
author_sort Khairulnadzmi, Jamaluddin
title Optimal nuclear trigeneration system considering life cycle costing
title_short Optimal nuclear trigeneration system considering life cycle costing
title_full Optimal nuclear trigeneration system considering life cycle costing
title_fullStr Optimal nuclear trigeneration system considering life cycle costing
title_full_unstemmed Optimal nuclear trigeneration system considering life cycle costing
title_sort optimal nuclear trigeneration system considering life cycle costing
publisher Elsevier Ltd
publishDate 2022
url http://umpir.ump.edu.my/id/eprint/40190/1/Optimal%20nuclear%20trigeneration%20system%20considering%20life.pdf
http://umpir.ump.edu.my/id/eprint/40190/2/Optimal%20nuclear%20trigeneration%20system%20considering%20life%20cycle%20costing_ABS.pdf
http://umpir.ump.edu.my/id/eprint/40190/
https://doi.org/10.1016/j.jclepro.2022.133399
https://doi.org/10.1016/j.jclepro.2022.133399
_version_ 1822924123876098048