An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing

In a typical assembly optimisation, Assembly Sequence Planning and Assembly Line Balancing are performed independently. However, competition has compelled the manufacturer to innovate by integrating the optimisation of both problems. To incorporate ASP and ALB optimisations into a single integrated...

Full description

Saved in:
Bibliographic Details
Main Authors: M. F. F., Ab Rashid, Tiwari, Ashutosh, Hutabarat, Windo
Format: Conference or Workshop Item
Language:English
Published: 2011
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/5280/1/ICMR_Assembly_sequence_planning-2011.pdf
http://umpir.ump.edu.my/id/eprint/5280/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Pahang
Language: English
id my.ump.umpir.5280
record_format eprints
spelling my.ump.umpir.52802015-03-03T09:24:03Z http://umpir.ump.edu.my/id/eprint/5280/ An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing M. F. F., Ab Rashid Tiwari, Ashutosh Hutabarat, Windo TS Manufactures In a typical assembly optimisation, Assembly Sequence Planning and Assembly Line Balancing are performed independently. However, competition has compelled the manufacturer to innovate by integrating the optimisation of both problems. To incorporate ASP and ALB optimisations into a single integrated optimisation, a clear prerequisite is the availability of integrated ASP and ALB representation. Although many assembly representation works has been proposed, none of them fully meet the requirements of integrated optimisation because they were developed independently from various needs. In this paper, an integrated representation scheme for ASP and ALB that incorporate essential optimisation information is developed. The proposed representation scheme is built based on assembly tasks and represented using precedence graph and data matrix. The outcome from presented example showed that the information for ASP and ALB optimisation can be integrated and represented using task based precedence graph and data matrix, without discarding important attributes. 2011 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/5280/1/ICMR_Assembly_sequence_planning-2011.pdf M. F. F., Ab Rashid and Tiwari, Ashutosh and Hutabarat, Windo (2011) An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing. In: Proceedings of the 9thInternational Conference on Manufacturing Research (ICMR 2011), 6-8 September 2011 , Glasgow, UK. pp. 125-131..
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
M. F. F., Ab Rashid
Tiwari, Ashutosh
Hutabarat, Windo
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
description In a typical assembly optimisation, Assembly Sequence Planning and Assembly Line Balancing are performed independently. However, competition has compelled the manufacturer to innovate by integrating the optimisation of both problems. To incorporate ASP and ALB optimisations into a single integrated optimisation, a clear prerequisite is the availability of integrated ASP and ALB representation. Although many assembly representation works has been proposed, none of them fully meet the requirements of integrated optimisation because they were developed independently from various needs. In this paper, an integrated representation scheme for ASP and ALB that incorporate essential optimisation information is developed. The proposed representation scheme is built based on assembly tasks and represented using precedence graph and data matrix. The outcome from presented example showed that the information for ASP and ALB optimisation can be integrated and represented using task based precedence graph and data matrix, without discarding important attributes.
format Conference or Workshop Item
author M. F. F., Ab Rashid
Tiwari, Ashutosh
Hutabarat, Windo
author_facet M. F. F., Ab Rashid
Tiwari, Ashutosh
Hutabarat, Windo
author_sort M. F. F., Ab Rashid
title An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
title_short An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
title_full An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
title_fullStr An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
title_full_unstemmed An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
title_sort integrated representation scheme for assembly sequence planning and assembly line balancing
publishDate 2011
url http://umpir.ump.edu.my/id/eprint/5280/1/ICMR_Assembly_sequence_planning-2011.pdf
http://umpir.ump.edu.my/id/eprint/5280/
_version_ 1643665168063791104