An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
In a typical assembly optimisation, Assembly Sequence Planning and Assembly Line Balancing are performed independently. However, competition has compelled the manufacturer to innovate by integrating the optimisation of both problems. To incorporate ASP and ALB optimisations into a single integrated...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/5280/1/ICMR_Assembly_sequence_planning-2011.pdf http://umpir.ump.edu.my/id/eprint/5280/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Pahang |
Language: | English |
id |
my.ump.umpir.5280 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.52802015-03-03T09:24:03Z http://umpir.ump.edu.my/id/eprint/5280/ An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing M. F. F., Ab Rashid Tiwari, Ashutosh Hutabarat, Windo TS Manufactures In a typical assembly optimisation, Assembly Sequence Planning and Assembly Line Balancing are performed independently. However, competition has compelled the manufacturer to innovate by integrating the optimisation of both problems. To incorporate ASP and ALB optimisations into a single integrated optimisation, a clear prerequisite is the availability of integrated ASP and ALB representation. Although many assembly representation works has been proposed, none of them fully meet the requirements of integrated optimisation because they were developed independently from various needs. In this paper, an integrated representation scheme for ASP and ALB that incorporate essential optimisation information is developed. The proposed representation scheme is built based on assembly tasks and represented using precedence graph and data matrix. The outcome from presented example showed that the information for ASP and ALB optimisation can be integrated and represented using task based precedence graph and data matrix, without discarding important attributes. 2011 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/5280/1/ICMR_Assembly_sequence_planning-2011.pdf M. F. F., Ab Rashid and Tiwari, Ashutosh and Hutabarat, Windo (2011) An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing. In: Proceedings of the 9thInternational Conference on Manufacturing Research (ICMR 2011), 6-8 September 2011 , Glasgow, UK. pp. 125-131.. |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English |
topic |
TS Manufactures |
spellingShingle |
TS Manufactures M. F. F., Ab Rashid Tiwari, Ashutosh Hutabarat, Windo An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing |
description |
In a typical assembly optimisation, Assembly Sequence Planning and Assembly Line Balancing are performed independently. However, competition has compelled the manufacturer to innovate by integrating the optimisation of both problems. To incorporate ASP and ALB optimisations into a single integrated optimisation, a clear prerequisite is the availability of integrated ASP and ALB representation. Although many assembly representation works has been proposed, none of them fully meet the requirements of integrated optimisation because they were developed independently from various needs. In this paper, an integrated representation scheme for ASP and ALB that incorporate essential optimisation information is developed. The proposed representation scheme is built based on assembly tasks and represented using precedence graph and data matrix. The outcome from presented example
showed that the information for ASP and ALB optimisation can be integrated and represented using task based precedence graph and data matrix, without discarding important attributes.
|
format |
Conference or Workshop Item |
author |
M. F. F., Ab Rashid Tiwari, Ashutosh Hutabarat, Windo |
author_facet |
M. F. F., Ab Rashid Tiwari, Ashutosh Hutabarat, Windo |
author_sort |
M. F. F., Ab Rashid |
title |
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
|
title_short |
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
|
title_full |
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
|
title_fullStr |
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
|
title_full_unstemmed |
An Integrated Representation Scheme for Assembly Sequence Planning and Assembly Line Balancing
|
title_sort |
integrated representation scheme for assembly sequence planning and assembly line balancing |
publishDate |
2011 |
url |
http://umpir.ump.edu.my/id/eprint/5280/1/ICMR_Assembly_sequence_planning-2011.pdf http://umpir.ump.edu.my/id/eprint/5280/ |
_version_ |
1643665168063791104 |