A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time

S-Curve analysis in the construction interpreted as managing project with knowledge and traceable in the context of sustainable construction while displays the cumulative costs, labour hours or other quantities plotted against time. In the contract administration, delays in completing a construction...

Full description

Saved in:
Bibliographic Details
Main Authors: Habib Musa Mohamad, Mohamad Ibrahim Mohamad, Ismail Saad, Nurmin Bolong, J. Mustazama, Siti Nooraiin Mohd Razali
Format: Article
Language:English
English
Published: Salehan Institute of Higher Education 2021
Subjects:
Online Access:https://eprints.ums.edu.my/id/eprint/30607/2/A%20case%20study%20of%20S-Curve%20analysis%2C%20Causes%2C%20effects%2C%20tracing%20and%20monitoring%20project%20extension%20of%20time-Abstract.pdf
https://eprints.ums.edu.my/id/eprint/30607/1/A%20case%20study%20of%20S-Curve%20analysis%2C%20Causes%2C%20effects%2C%20tracing%20and%20monitoring%20project%20extension%20of%20time.pdf
https://eprints.ums.edu.my/id/eprint/30607/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85108438142&doi=10.28991%2fcej-2021-03091679&partnerID=40&md5=48ab901d308b302150184acec8b856cd
http://dx.doi.org/10.28991/cej-2021-03091679
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Sabah
Language: English
English