Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study

Building Information Modelling is method of combining modelling data from many sources to produce virtual models of intelligently parameterized facilities. BIM 6D is known as the production of an energy model for sustainable building in a simple way. Unfortunately, slow adoption of BIM in Malaysia&#...

Full description

Saved in:
Bibliographic Details
Main Author: Samirah Farhanah Suhadi
Format: Academic Exercise
Language:English
English
Published: 2022
Subjects:
Online Access:https://eprints.ums.edu.my/id/eprint/35249/1/24%20PAGES.pdf
https://eprints.ums.edu.my/id/eprint/35249/2/FULLTEXT.pdf
https://eprints.ums.edu.my/id/eprint/35249/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Sabah
Language: English
English
id my.ums.eprints.35249
record_format eprints
spelling my.ums.eprints.352492023-03-23T02:18:47Z https://eprints.ums.edu.my/id/eprint/35249/ Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study Samirah Farhanah Suhadi TH900-915 Construction equipment in building Building Information Modelling is method of combining modelling data from many sources to produce virtual models of intelligently parameterized facilities. BIM 6D is known as the production of an energy model for sustainable building in a simple way. Unfortunately, slow adoption of BIM in Malaysia's building industry have highlighted the need to identify the significant of BIM adoption in Malaysian‘s construction industry. This study also analyse the sustainability and energy analysis for Multi-Storey Building and determine the challenges in BIM and strategies that will enhance effective. A total 51 feedbacks were received. The study found the most concerned barriers factor in implementing BIM in Malaysian construction industry is expensive software with highest means index of 4.06 while the most supported strategies in implementing BIM is related to economic which by subsiding the price of BIM software with mean score 4.73. Moreover, this study was done for Sipitang District Police Headquarters, Sabah project to better examine the benefits and limitations of 6D BIM. By minimizing Window-Wall Ratio, Infiltration, Lighting Efficiency, Daylighting and Occupancy Controls and Plug Load Efficiency could lead significant reduction about 43% in annual mean energy use which have been done by Green Building Studio (GBS) and Insight 360. 2022 Academic Exercise NonPeerReviewed text en https://eprints.ums.edu.my/id/eprint/35249/1/24%20PAGES.pdf text en https://eprints.ums.edu.my/id/eprint/35249/2/FULLTEXT.pdf Samirah Farhanah Suhadi (2022) Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study. Universiti Malaysia Sabah. (Unpublished)
institution Universiti Malaysia Sabah
building UMS Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sabah
content_source UMS Institutional Repository
url_provider http://eprints.ums.edu.my/
language English
English
topic TH900-915 Construction equipment in building
spellingShingle TH900-915 Construction equipment in building
Samirah Farhanah Suhadi
Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study
description Building Information Modelling is method of combining modelling data from many sources to produce virtual models of intelligently parameterized facilities. BIM 6D is known as the production of an energy model for sustainable building in a simple way. Unfortunately, slow adoption of BIM in Malaysia's building industry have highlighted the need to identify the significant of BIM adoption in Malaysian‘s construction industry. This study also analyse the sustainability and energy analysis for Multi-Storey Building and determine the challenges in BIM and strategies that will enhance effective. A total 51 feedbacks were received. The study found the most concerned barriers factor in implementing BIM in Malaysian construction industry is expensive software with highest means index of 4.06 while the most supported strategies in implementing BIM is related to economic which by subsiding the price of BIM software with mean score 4.73. Moreover, this study was done for Sipitang District Police Headquarters, Sabah project to better examine the benefits and limitations of 6D BIM. By minimizing Window-Wall Ratio, Infiltration, Lighting Efficiency, Daylighting and Occupancy Controls and Plug Load Efficiency could lead significant reduction about 43% in annual mean energy use which have been done by Green Building Studio (GBS) and Insight 360.
format Academic Exercise
author Samirah Farhanah Suhadi
author_facet Samirah Farhanah Suhadi
author_sort Samirah Farhanah Suhadi
title Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study
title_short Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study
title_full Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study
title_fullStr Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study
title_full_unstemmed Sustainability and energy efficiency: BIM 6D for multi-storey building- a case study
title_sort sustainability and energy efficiency: bim 6d for multi-storey building- a case study
publishDate 2022
url https://eprints.ums.edu.my/id/eprint/35249/1/24%20PAGES.pdf
https://eprints.ums.edu.my/id/eprint/35249/2/FULLTEXT.pdf
https://eprints.ums.edu.my/id/eprint/35249/
_version_ 1761617772346867712