Methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line
Modern manufacturing system requires high rate productivity with low cost unit price to maintain its competitiveness in global market. To achieve these goal common investigation of productivity in manufacturing especially in assembly line environment consist of two main purposes: (1) To determine...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
Universiti Malaysia Perlis (UniMAP)
2013
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/24245 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Perlis |
Language: | English |
id |
my.unimap-24245 |
---|---|
record_format |
dspace |
spelling |
my.unimap-242452013-04-05T02:11:03Z Methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line Abdul Rahman, Riza Productivity calculation Assembly line Balancing Optimization Modern manufacturing system requires high rate productivity with low cost unit price to maintain its competitiveness in global market. To achieve these goal common investigation of productivity in manufacturing especially in assembly line environment consist of two main purposes: (1) To determine potential reserve of productivity in actual production condition, and (2) To provide initial parameter for planning a new process arrangement based on prior experience of actual operating arrangement. The calculation of productivity itself shall easily be applied for various kind of assembly type such manual, automatic or hybrid and also may cover the complexity of various models of products its produces. By using chronometric analysis as the statistical basis, the formulation for productivity calculation must cover all its complexity mathematically. The result of productivity calculation should be compared to graph of price per unit under the same domain to determine the range of optimization regimes. The final result is reliable important data for corporate decision makers to choose the optimum configuration between the most economical configuration and the most productive configuration. 2013-04-05T02:11:03Z 2013-04-05T02:11:03Z 2011 Thesis http://hdl.handle.net/123456789/24245 en Universiti Malaysia Perlis (UniMAP) School of Manufacturing Engineering |
institution |
Universiti Malaysia Perlis |
building |
UniMAP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Perlis |
content_source |
UniMAP Library Digital Repository |
url_provider |
http://dspace.unimap.edu.my/ |
language |
English |
topic |
Productivity calculation Assembly line Balancing Optimization |
spellingShingle |
Productivity calculation Assembly line Balancing Optimization Abdul Rahman, Riza Methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line |
description |
Modern manufacturing system requires high rate productivity with low cost unit price
to maintain its competitiveness in global market. To achieve these goal common
investigation of productivity in manufacturing especially in assembly line environment
consist of two main purposes: (1) To determine potential reserve of productivity in
actual production condition, and (2) To provide initial parameter for planning a new
process arrangement based on prior experience of actual operating arrangement. The
calculation of productivity itself shall easily be applied for various kind of assembly
type such manual, automatic or hybrid and also may cover the complexity of various
models of products its produces. By using chronometric analysis as the statistical basis,
the formulation for productivity calculation must cover all its complexity
mathematically. The result of productivity calculation should be compared to graph of
price per unit under the same domain to determine the range of optimization regimes.
The final result is reliable important data for corporate decision makers to choose the
optimum configuration between the most economical configuration and the most
productive configuration. |
format |
Thesis |
author |
Abdul Rahman, Riza |
author_facet |
Abdul Rahman, Riza |
author_sort |
Abdul Rahman, Riza |
title |
Methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line |
title_short |
Methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line |
title_full |
Methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line |
title_fullStr |
Methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line |
title_full_unstemmed |
Methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line |
title_sort |
methodology development for ccalculating productivity and its losses to determine optimization regime in assembly line |
publisher |
Universiti Malaysia Perlis (UniMAP) |
publishDate |
2013 |
url |
http://dspace.unimap.edu.my/xmlui/handle/123456789/24245 |
_version_ |
1643794291970015232 |