Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia
Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis.
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Working Paper |
Language: | English |
Published: |
Malaysian Technical Universities Network (MTUN)
2013
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/30293 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Perlis |
Language: | English |
id |
my.unimap-30293 |
---|---|
record_format |
dspace |
spelling |
my.unimap-302932013-12-10T04:12:52Z Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia Aftab Hameed, Memon Ismail Abdul, Rahman Ade Asmi, Abdul Azis aftabm78@hotmail.com ismailar@uthm.edu.my ade.asmi@bakrie.ac.id Construction resources Central Malaysia Southern Malaysia PLS path modeling Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis. Construction resources are fundamental requirement for any construction project to achieve project completion within estimated budget. The fundamental construction resources include material, manpower, machinery and money. These resources have significant effect on construction cost. Construction cost is now a days facing problem of coverrun. Hence, it is very ctitical to assess impact of various resources on cost overrun. Data collection was carried out using structured questionnaire survey amonst client, consultant and contractors in southern and central region of Malaysia. A total of 234 questionnaire were collected including 128 in southern part and 106 in central part. Data was analayzed with PLS path modeling using SmartPLS v2.0 software. The result showed that resources have significant effect on cost overrun. Extracted variance showed that in southern region, around 40% of cost variation can be caused because of construction resource while in central region variance is achieved as 59%. Material resource was found as common and most significant resource in southern and central region. GoF value was achieved as 0.529 and 0.566 for southern and central regions respectively confirming the explaining power of the proposed path model. 2013-12-10T04:12:52Z 2013-12-10T04:12:52Z 2012-11-20 Working Paper p. 595-599 http://hdl.handle.net/123456789/30293 en Proceeding of the Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012; Malaysian Technical Universities Network (MTUN) |
institution |
Universiti Malaysia Perlis |
building |
UniMAP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Perlis |
content_source |
UniMAP Library Digital Repository |
url_provider |
http://dspace.unimap.edu.my/ |
language |
English |
topic |
Construction resources Central Malaysia Southern Malaysia PLS path modeling |
spellingShingle |
Construction resources Central Malaysia Southern Malaysia PLS path modeling Aftab Hameed, Memon Ismail Abdul, Rahman Ade Asmi, Abdul Azis Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia |
description |
Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis. |
author2 |
aftabm78@hotmail.com |
author_facet |
aftabm78@hotmail.com Aftab Hameed, Memon Ismail Abdul, Rahman Ade Asmi, Abdul Azis |
format |
Working Paper |
author |
Aftab Hameed, Memon Ismail Abdul, Rahman Ade Asmi, Abdul Azis |
author_sort |
Aftab Hameed, Memon |
title |
Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia |
title_short |
Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia |
title_full |
Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia |
title_fullStr |
Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia |
title_full_unstemmed |
Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia |
title_sort |
assessing causal relationships between construction resources and cost overrun using pls path modeling focusing in southern and central region of malaysia |
publisher |
Malaysian Technical Universities Network (MTUN) |
publishDate |
2013 |
url |
http://dspace.unimap.edu.my/xmlui/handle/123456789/30293 |
_version_ |
1643795562294673408 |