Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia

Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis.

Saved in:
Bibliographic Details
Main Authors: Aftab Hameed, Memon, Ismail Abdul, Rahman, Ade Asmi, Abdul Azis
Other Authors: aftabm78@hotmail.com
Format: Working Paper
Language:English
Published: Malaysian Technical Universities Network (MTUN) 2013
Subjects:
Online Access:http://dspace.unimap.edu.my/xmlui/handle/123456789/30293
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Perlis
Language: English
id my.unimap-30293
record_format dspace
spelling my.unimap-302932013-12-10T04:12:52Z Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia Aftab Hameed, Memon Ismail Abdul, Rahman Ade Asmi, Abdul Azis aftabm78@hotmail.com ismailar@uthm.edu.my ade.asmi@bakrie.ac.id Construction resources Central Malaysia Southern Malaysia PLS path modeling Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis. Construction resources are fundamental requirement for any construction project to achieve project completion within estimated budget. The fundamental construction resources include material, manpower, machinery and money. These resources have significant effect on construction cost. Construction cost is now a days facing problem of coverrun. Hence, it is very ctitical to assess impact of various resources on cost overrun. Data collection was carried out using structured questionnaire survey amonst client, consultant and contractors in southern and central region of Malaysia. A total of 234 questionnaire were collected including 128 in southern part and 106 in central part. Data was analayzed with PLS path modeling using SmartPLS v2.0 software. The result showed that resources have significant effect on cost overrun. Extracted variance showed that in southern region, around 40% of cost variation can be caused because of construction resource while in central region variance is achieved as 59%. Material resource was found as common and most significant resource in southern and central region. GoF value was achieved as 0.529 and 0.566 for southern and central regions respectively confirming the explaining power of the proposed path model. 2013-12-10T04:12:52Z 2013-12-10T04:12:52Z 2012-11-20 Working Paper p. 595-599 http://hdl.handle.net/123456789/30293 en Proceeding of the Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012; Malaysian Technical Universities Network (MTUN)
institution Universiti Malaysia Perlis
building UniMAP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Perlis
content_source UniMAP Library Digital Repository
url_provider http://dspace.unimap.edu.my/
language English
topic Construction resources
Central Malaysia
Southern Malaysia
PLS path modeling
spellingShingle Construction resources
Central Malaysia
Southern Malaysia
PLS path modeling
Aftab Hameed, Memon
Ismail Abdul, Rahman
Ade Asmi, Abdul Azis
Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia
description Malaysian Technical Universities Conference on Engineering and Technology (MUCET) 2012 organised by technical universities under the Malaysian Technical Universities Network (MTUN), 20th - 21st November 2012 at Hotel Seri Malaysia, Kangar, Perlis.
author2 aftabm78@hotmail.com
author_facet aftabm78@hotmail.com
Aftab Hameed, Memon
Ismail Abdul, Rahman
Ade Asmi, Abdul Azis
format Working Paper
author Aftab Hameed, Memon
Ismail Abdul, Rahman
Ade Asmi, Abdul Azis
author_sort Aftab Hameed, Memon
title Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia
title_short Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia
title_full Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia
title_fullStr Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia
title_full_unstemmed Assessing causal relationships between construction resources and cost overrun using PLS path modeling focusing in southern and central region of Malaysia
title_sort assessing causal relationships between construction resources and cost overrun using pls path modeling focusing in southern and central region of malaysia
publisher Malaysian Technical Universities Network (MTUN)
publishDate 2013
url http://dspace.unimap.edu.my/xmlui/handle/123456789/30293
_version_ 1643795562294673408