Readiness for industrialized building system implementation among Malaysian architectural firms' members

Link to publisher's homepage at https://jurnalteknologi.utm.my

Saved in:
Bibliographic Details
Main Authors: Mohd Hanizun, Hanafia, Arniza, Abas, Fazdliel Aswad, Ibrahim, Shardy Abdullah
Other Authors: hanizun@usm.my
Format: Article
Language:English
Published: Penerbit UTM Press 2019
Subjects:
Online Access:http://dspace.unimap.edu.my:80/xmlui/handle/123456789/63570
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Perlis
Language: English
id my.unimap-63570
record_format dspace
spelling my.unimap-635702019-12-03T07:07:55Z Readiness for industrialized building system implementation among Malaysian architectural firms' members Mohd Hanizun, Hanafia Arniza, Abas Fazdliel Aswad, Ibrahim Shardy Abdullah hanizun@usm.my Organizational readiness Architectural firms Implementation Industrialized building system Malaysia Link to publisher's homepage at https://jurnalteknologi.utm.my The Malaysian construction industry has lags behind other industries in terms of performance that had drawn the attention to implement innovative construction method like Industrial Building System (IBS). However, the implementation of IBS in Malaysia remains low although the Government had commenced various efforts. The architects have been perceived as the prime mover for construction innovations by integrating their roles as designer, manager, and professional advisor with their strength in design. Therefore, this paper is designed to assess readiness for IBS implementation among organizational members of architectural firms by examining the influence of demographic backgrounds. The study distributes questionnaires to randomly selected respondents who represent firms that are located in highly developed states in Malaysia. Various analysis techniques have been used namely Cronbach’s Alpha coefficients, frequency, mean, standard deviation, one-way ANOVA, and independent samples t-test towards achieving the research objective. The findings disclose that working experience in tender and construction stage (more than 18 years) indicate high likelihood of readiness to implement IBS. This research also reveals that demographic variables (job designation, working experience in design stage, and working experience in tender and construction stage) has significant impacts on the decision maker category, whereas decision maker is the most influential aspect for organizational readiness to implement IBS. 2019-12-03T07:07:55Z 2019-12-03T07:07:55Z 2016 Article Jurnal Teknologi, vol.78(7), 2016, 195-203 2180–3722 (online) http://dspace.unimap.edu.my:80/xmlui/handle/123456789/63570 https://jurnalteknologi.utm.my/index.php/jurnalteknologi/article/view/4960/5538 en Penerbit UTM Press
institution Universiti Malaysia Perlis
building UniMAP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Perlis
content_source UniMAP Library Digital Repository
url_provider http://dspace.unimap.edu.my/
language English
topic Organizational readiness
Architectural firms
Implementation
Industrialized building system
Malaysia
spellingShingle Organizational readiness
Architectural firms
Implementation
Industrialized building system
Malaysia
Mohd Hanizun, Hanafia
Arniza, Abas
Fazdliel Aswad, Ibrahim
Shardy Abdullah
Readiness for industrialized building system implementation among Malaysian architectural firms' members
description Link to publisher's homepage at https://jurnalteknologi.utm.my
author2 hanizun@usm.my
author_facet hanizun@usm.my
Mohd Hanizun, Hanafia
Arniza, Abas
Fazdliel Aswad, Ibrahim
Shardy Abdullah
format Article
author Mohd Hanizun, Hanafia
Arniza, Abas
Fazdliel Aswad, Ibrahim
Shardy Abdullah
author_sort Mohd Hanizun, Hanafia
title Readiness for industrialized building system implementation among Malaysian architectural firms' members
title_short Readiness for industrialized building system implementation among Malaysian architectural firms' members
title_full Readiness for industrialized building system implementation among Malaysian architectural firms' members
title_fullStr Readiness for industrialized building system implementation among Malaysian architectural firms' members
title_full_unstemmed Readiness for industrialized building system implementation among Malaysian architectural firms' members
title_sort readiness for industrialized building system implementation among malaysian architectural firms' members
publisher Penerbit UTM Press
publishDate 2019
url http://dspace.unimap.edu.my:80/xmlui/handle/123456789/63570
_version_ 1654961444010065920