The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam
Following the policy on "the state and people working together", farmers in different regions of Viet Nam have contributed significantly in investing, operating and maintaining irrigation systems at various levels. Thanh Hoa province is one of the first districts that have been implemen...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
Universiti Malaysia Sarawak, (UNIMAS)
2005
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/12390/1/Bui%20Thi%20Thu%20Hoa%20ft.pdf http://ir.unimas.my/id/eprint/12390/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Sarawak |
Language: | English |
id |
my.unimas.ir.12390 |
---|---|
record_format |
eprints |
spelling |
my.unimas.ir.123902023-04-13T04:51:41Z http://ir.unimas.my/id/eprint/12390/ The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam Bui, Thi Thu Hoa S Agriculture (General) Following the policy on "the state and people working together", farmers in different regions of Viet Nam have contributed significantly in investing, operating and maintaining irrigation systems at various levels. Thanh Hoa province is one of the first districts that have been implementing this policy in the North of Viet Nam, which focuses on B8A Water User Association (WUA) establishment. The purpose of this study is to find out the status and to assess the performance of the WUA through participation of the local people after seven years of operation. Cost - benefit all was performed to evaluate the efficiency of the project in terns of economics. The results show that this project bring not only private benefits but also public benefits to the community with value of NPV and B/C ratio of greater than 0 and 1 respectively. The efficiency of farmers' participation is clearer through results of socio - economic perspectives. In terms of participatory irrigation management, users are actively involved in planning and implementing the process regardless of age. Results of correlation analysis found that there is no significant relationship between age of respondents and the participation of water users in various activities and function of the WUA. The study was also determined and comparing the difference of socioeconomic aspects before 1998 (before the project) and present. The results of the correlation analysis were positive in terms of the total paddy production and the percentage of irrigated area in 2004, the average income, and the total agricultural production. A t-test was applied to analyze the significant difference in the level of income during the time before 1998 and 2004. The finding shows that there was difference between two average income levels at the two periods (before 1998 and now). In 2004, the average income was higher than that before 1998. The WUA establishment also had reduced conflicts and health care problems significantly. Universiti Malaysia Sarawak, (UNIMAS) 2005 Thesis NonPeerReviewed text en http://ir.unimas.my/id/eprint/12390/1/Bui%20Thi%20Thu%20Hoa%20ft.pdf Bui, Thi Thu Hoa (2005) The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam. Masters thesis, Universiti Malaysia Sarawak, (UNIMAS). |
institution |
Universiti Malaysia Sarawak |
building |
Centre for Academic Information Services (CAIS) |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Sarawak |
content_source |
UNIMAS Institutional Repository |
url_provider |
http://ir.unimas.my/ |
language |
English |
topic |
S Agriculture (General) |
spellingShingle |
S Agriculture (General) Bui, Thi Thu Hoa The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam |
description |
Following the policy on "the state and people working together", farmers in different
regions of Viet Nam have contributed significantly in investing, operating and
maintaining irrigation systems at various levels. Thanh Hoa province is one of the first
districts that have been implementing this policy in the North of Viet Nam, which
focuses on B8A Water User Association (WUA) establishment. The purpose of this
study is to find out the status and to assess the performance of the WUA through
participation of the local people after seven years of operation. Cost - benefit all
was performed to evaluate the efficiency of the project in terns of economics. The
results show that this project bring not only private benefits but also public benefits to
the community with value of NPV and B/C ratio of greater than 0 and 1 respectively.
The efficiency of farmers' participation is clearer through results of socio - economic
perspectives. In terms of participatory irrigation management, users are actively
involved in planning and implementing the process regardless of age. Results of
correlation analysis found that there is no significant relationship between age of
respondents and the participation of water users in various activities and function of
the WUA. The study was also determined and comparing the difference of socioeconomic
aspects before 1998 (before the project) and present. The results of the
correlation analysis were positive in terms of the total paddy production and the
percentage of irrigated area in 2004, the average income, and the total agricultural
production. A t-test was applied to analyze the significant difference in the level of
income during the time before 1998 and 2004. The finding shows that there was
difference between two average income levels at the two periods (before 1998 and now).
In 2004, the average income was higher than that before 1998. The WUA
establishment also had reduced conflicts and health care problems significantly. |
format |
Thesis |
author |
Bui, Thi Thu Hoa |
author_facet |
Bui, Thi Thu Hoa |
author_sort |
Bui, Thi Thu Hoa |
title |
The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam |
title_short |
The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam |
title_full |
The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam |
title_fullStr |
The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam |
title_full_unstemmed |
The implementation of irrigation system through stakeholders participation in B8A Secondary canal, Chu River area, Thieu Hoa district, Thanh Hoa Province, Vietnam |
title_sort |
implementation of irrigation system through stakeholders participation in b8a secondary canal, chu river area, thieu hoa district, thanh hoa province, vietnam |
publisher |
Universiti Malaysia Sarawak, (UNIMAS) |
publishDate |
2005 |
url |
http://ir.unimas.my/id/eprint/12390/1/Bui%20Thi%20Thu%20Hoa%20ft.pdf http://ir.unimas.my/id/eprint/12390/ |
_version_ |
1763300200516943872 |