Major challenges in implementing green construction
Green construction is associated with a plethora of challenges. On the account of these challenges, this research strived to explore the major challenges associated with the implementation of green construction. A total of 346 survey questionnaires were gathered from the top to middle managerial pos...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Medwell Publishing
2018
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/22545/1/Afzan%2C%20Binti%20Ahmad%20Zaini.pdf http://ir.unimas.my/id/eprint/22545/ https://www.medwelljournals.com/abstract/?doi=jeasci.2018.8865.8869&keyword=Major%20challenges%20in%20implementing%20green%20construction |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Sarawak |
Language: | English |
id |
my.unimas.ir.22545 |
---|---|
record_format |
eprints |
spelling |
my.unimas.ir.225452023-03-29T07:00:33Z http://ir.unimas.my/id/eprint/22545/ Major challenges in implementing green construction Afzan, Ahmad Zaini Intan Rohani, Endut TA Engineering (General). Civil engineering (General) Green construction is associated with a plethora of challenges. On the account of these challenges, this research strived to explore the major challenges associated with the implementation of green construction. A total of 346 survey questionnaires were gathered from the top to middle managerial positions in Malaysia’s construction industry. The theoretical framework was established and the data were analyzed using Exploratory Factor Analysis (EFA) and Structural Equation Modeling (SEM-AMOS). The rotated dimensions were renamed as “Operational Concerns,” “Government support,” “Economic and financial constraints,” “Lack of education and regulatory compliance,” “Industrial barriers” and “Organizational challenges” based on the theoretical framework. The results from the SEM-AMOS analysis denoted that all the major challenges were full moderation. Consequently, these results were complemented with 25 semi-structured interviews among construction stakeholders. The findings from the semi-structured interviews were analyzed using NVivo-9 Software. The insights revealed that the challenges were referenced 85 times. “High overall and up-front cost” was referenced 19 times as the highest reference, while “Difficulties in transportation and logistics” was referenced one time as the lowest reference. The original contributions in this study can be seen through the mixed method approach (i.e., qualitative and quantitative) in order to identify the most prominent challenges in the construction industry. The findings concluded that identifying the major challenges would help construction stakeholders minimize these challenges and encourage them to be more attentive and open towards the challenges in green construction. Medwell Publishing 2018 Article PeerReviewed text en http://ir.unimas.my/id/eprint/22545/1/Afzan%2C%20Binti%20Ahmad%20Zaini.pdf Afzan, Ahmad Zaini and Intan Rohani, Endut (2018) Major challenges in implementing green construction. Journal of Engineering and Applied Sciences, 13 (11). pp. 8865-8869. ISSN 1818-7803 https://www.medwelljournals.com/abstract/?doi=jeasci.2018.8865.8869&keyword=Major%20challenges%20in%20implementing%20green%20construction DOI: 10.3923/jeasci.2018.8865.8869 |
institution |
Universiti Malaysia Sarawak |
building |
Centre for Academic Information Services (CAIS) |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Sarawak |
content_source |
UNIMAS Institutional Repository |
url_provider |
http://ir.unimas.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) |
spellingShingle |
TA Engineering (General). Civil engineering (General) Afzan, Ahmad Zaini Intan Rohani, Endut Major challenges in implementing green construction |
description |
Green construction is associated with a plethora of challenges. On the account of these challenges, this research strived to explore the major challenges associated with the implementation of green construction. A total of 346 survey questionnaires were gathered from the top to middle managerial positions in Malaysia’s construction industry. The theoretical framework was established and the data were analyzed using Exploratory Factor Analysis (EFA) and Structural Equation Modeling (SEM-AMOS). The rotated dimensions were renamed as “Operational Concerns,” “Government support,” “Economic and financial constraints,” “Lack of education and regulatory compliance,” “Industrial barriers” and “Organizational challenges” based on the theoretical framework. The results from the SEM-AMOS analysis denoted that all the major challenges were full moderation. Consequently, these results were complemented with 25 semi-structured interviews among construction stakeholders. The findings from the semi-structured interviews were analyzed using NVivo-9 Software. The insights revealed that the challenges were referenced 85 times. “High overall and up-front cost” was referenced 19 times as the highest reference, while “Difficulties in transportation and logistics” was referenced one time as the lowest reference. The original contributions in this study can be seen through the mixed method approach (i.e., qualitative and quantitative) in order to identify the most prominent challenges in the construction industry. The findings concluded that identifying the major challenges would help construction stakeholders minimize these challenges and encourage them to be more attentive and open towards the challenges in green construction. |
format |
Article |
author |
Afzan, Ahmad Zaini Intan Rohani, Endut |
author_facet |
Afzan, Ahmad Zaini Intan Rohani, Endut |
author_sort |
Afzan, Ahmad Zaini |
title |
Major challenges in implementing green construction |
title_short |
Major challenges in implementing green construction |
title_full |
Major challenges in implementing green construction |
title_fullStr |
Major challenges in implementing green construction |
title_full_unstemmed |
Major challenges in implementing green construction |
title_sort |
major challenges in implementing green construction |
publisher |
Medwell Publishing |
publishDate |
2018 |
url |
http://ir.unimas.my/id/eprint/22545/1/Afzan%2C%20Binti%20Ahmad%20Zaini.pdf http://ir.unimas.my/id/eprint/22545/ https://www.medwelljournals.com/abstract/?doi=jeasci.2018.8865.8869&keyword=Major%20challenges%20in%20implementing%20green%20construction |
_version_ |
1762396667026341888 |