Real-Life Optimum Shift Scheduling Design
In many industries, manpower shift scheduling poses problems that require immediate solutions. The fundamental need in this domain is to ensure that all shifts are assigned to cover all or as many jobs as possible. The shifts should additionally be planned with minimum manpower utilization, minimum...
Saved in:
Main Authors: | , |
---|---|
Format: | E-Article |
Language: | English |
Published: |
ITB Journal Publisher
2019
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/25764/1/Real-Life%20Optimum%20Shift%20Scheduling%20Design%20-%20Copy.pdf http://ir.unimas.my/id/eprint/25764/ http://journals.itb.ac.id/index.php/jictra/article/view/9108 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Sarawak |
Language: | English |