Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD
Transmission system is a crucial system in electrical power since the system transmit the electricity from power generation to consumer load. According to World Bank, the power losses from transmission lines are rapidly increasing from year to year at the rate of 3.85% in the year of...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Blue Eyes Intelligence Engineering & Sciences Publication
2020
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/32203/1/Transient%20Overvoltage%20Simulation%20in%20500%20kV%20Transmission%20Line%20Plan%20of%20Sarawak%2C%20Malaysia%20using%20PSCAD_pdf.pdf http://ir.unimas.my/id/eprint/32203/ https://www.ijitee.org/wp-content/uploads/papers/v9i4/D1458029420.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Malaysia Sarawak |
Language: | English |
id |
my.unimas.ir.32203 |
---|---|
record_format |
eprints |
spelling |
my.unimas.ir.322032020-10-16T06:46:44Z http://ir.unimas.my/id/eprint/32203/ Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD Yanuar, Z. Arief Nur Izziani, Roslan Mohd Hafiez Izzwan, Saad Lakshmanan, Gurusamy Nor Asiah, Muhamad TA Engineering (General). Civil engineering (General) TK Electrical engineering. Electronics Nuclear engineering Transmission system is a crucial system in electrical power since the system transmit the electricity from power generation to consumer load. According to World Bank, the power losses from transmission lines are rapidly increasing from year to year at the rate of 3.85% in the year of 2013 to 5.792%in 2014. Losses in transmission system are most likely from power quality problems such as transients. Transients are the outcome of high unexpected increment in voltage or current surge magnitudes. The peak values of both voltages and current are usuallymore than twice of that normal voltage and current amplitudes. The surges due to transients can vitally cause power system failure and breakdown of electrical equipment especially at the substations. There were few known transient overcurrent and overvoltage problems, which are due to faults, lightning and line energizing, respectively. This research work mainly focuses on simulating transients for 500 kV transmission system which employ Sarawak as the case study location. Sarawak currently has main 275 kVtransmission line covering the whole Sarawak from Miri to Kuching known as Sarawak backbone, but due to lots of industries and rapid development and urbanization boom in Sarawak, there is a planned of 500 kV transmission line as a backup if the 275 kV transmission line proves inadequate. In Sarawak, the 500 kV is planned to be energized at 275 kV. But, in fact this work is for that transmission line to be operated at 500 kV, hence, monitoring the highest transient may occur. The results revealed that lightning and three-phase faults of 1.0 s fault time duration cause the highest change in amplitude of current on the line up to 9.06 pu and 9.27 pu, respectively. The highest lightning amplitude is observed when lightning was simulated at the receiving end of the line which is near to the Tada substation. Blue Eyes Intelligence Engineering & Sciences Publication 2020 Article PeerReviewed text en http://ir.unimas.my/id/eprint/32203/1/Transient%20Overvoltage%20Simulation%20in%20500%20kV%20Transmission%20Line%20Plan%20of%20Sarawak%2C%20Malaysia%20using%20PSCAD_pdf.pdf Yanuar, Z. Arief and Nur Izziani, Roslan and Mohd Hafiez Izzwan, Saad and Lakshmanan, Gurusamy and Nor Asiah, Muhamad (2020) Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD. International Journal of Innovative Technology and Exploring Engineering (IJITEE), 9 (4). pp. 2481-2490. ISSN 2278-3075 https://www.ijitee.org/wp-content/uploads/papers/v9i4/D1458029420.pdf 10.35940/ijitee.D1458.029420 |
institution |
Universiti Malaysia Sarawak |
building |
Centre for Academic Information Services (CAIS) |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Sarawak |
content_source |
UNIMAS Institutional Repository |
url_provider |
http://ir.unimas.my/ |
language |
English |
topic |
TA Engineering (General). Civil engineering (General) TK Electrical engineering. Electronics Nuclear engineering |
spellingShingle |
TA Engineering (General). Civil engineering (General) TK Electrical engineering. Electronics Nuclear engineering Yanuar, Z. Arief Nur Izziani, Roslan Mohd Hafiez Izzwan, Saad Lakshmanan, Gurusamy Nor Asiah, Muhamad Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD |
description |
Transmission system is a crucial system in electrical power since the system transmit the electricity from power generation to consumer load. According to World Bank, the power losses from transmission lines are rapidly increasing from year to year at the rate of 3.85% in the year of 2013 to 5.792%in 2014. Losses in transmission system are most likely from power quality problems such as transients. Transients are the outcome of high unexpected increment in voltage or current surge magnitudes. The peak values of both voltages and current are usuallymore than twice of that normal voltage and current amplitudes. The surges due to transients can vitally cause power system failure and breakdown of electrical equipment especially at the substations. There were few known transient overcurrent and overvoltage problems, which are due to faults, lightning and line energizing, respectively. This research work mainly focuses on simulating transients for 500 kV transmission system which employ Sarawak as the case study location. Sarawak currently has main 275 kVtransmission line covering the whole Sarawak from Miri to Kuching known as Sarawak backbone, but due to lots of industries and rapid development and urbanization boom in Sarawak, there is a planned of 500 kV transmission line as a backup if the 275 kV transmission line proves inadequate. In Sarawak, the 500 kV is planned to be energized at 275 kV. But, in fact this work is for that transmission line to be operated at 500 kV, hence, monitoring the highest transient may occur. The results revealed that lightning and three-phase faults of 1.0 s fault time duration cause the highest change in amplitude of current on the line up to 9.06 pu and 9.27 pu, respectively. The highest lightning amplitude is observed when lightning was simulated at the receiving end of the line which is near to the Tada substation. |
format |
Article |
author |
Yanuar, Z. Arief Nur Izziani, Roslan Mohd Hafiez Izzwan, Saad Lakshmanan, Gurusamy Nor Asiah, Muhamad |
author_facet |
Yanuar, Z. Arief Nur Izziani, Roslan Mohd Hafiez Izzwan, Saad Lakshmanan, Gurusamy Nor Asiah, Muhamad |
author_sort |
Yanuar, Z. Arief |
title |
Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD |
title_short |
Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD |
title_full |
Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD |
title_fullStr |
Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD |
title_full_unstemmed |
Transient Overvoltage Simulation in 500 kV Transmission Line Plan of Sarawak, Malaysia using PSCAD |
title_sort |
transient overvoltage simulation in 500 kv transmission line plan of sarawak, malaysia using pscad |
publisher |
Blue Eyes Intelligence Engineering & Sciences Publication |
publishDate |
2020 |
url |
http://ir.unimas.my/id/eprint/32203/1/Transient%20Overvoltage%20Simulation%20in%20500%20kV%20Transmission%20Line%20Plan%20of%20Sarawak%2C%20Malaysia%20using%20PSCAD_pdf.pdf http://ir.unimas.my/id/eprint/32203/ https://www.ijitee.org/wp-content/uploads/papers/v9i4/D1458029420.pdf |
_version_ |
1681492679287898112 |