IBS in Residential Projects; Dissolving the Problems of On-site Component Installation

Installation the IBS components require detail precision and proper process, if not, the IBS adoption will not bring faster and cheaper cost but instead expose to spending more time for rectification of the defective works. Identifying the difficulties in conducting installation of IBS components is...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad, Abd Jalil, Shazwan, Mohamed Shaari, Nurina, Nawi
Format: Proceeding
Language:English
Published: 2021
Subjects:
Online Access:http://ir.unimas.my/id/eprint/37231/1/Dr%20Shazwan%20bin%20Mohamed%20Shaari.pdf
http://ir.unimas.my/id/eprint/37231/
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Sarawak
Language: English
id my.unimas.ir.37231
record_format eprints
spelling my.unimas.ir.372312021-12-16T06:17:01Z http://ir.unimas.my/id/eprint/37231/ IBS in Residential Projects; Dissolving the Problems of On-site Component Installation Ahmad, Abd Jalil Shazwan, Mohamed Shaari Nurina, Nawi T Technology (General) TH Building construction Installation the IBS components require detail precision and proper process, if not, the IBS adoption will not bring faster and cheaper cost but instead expose to spending more time for rectification of the defective works. Identifying the difficulties in conducting installation of IBS components is paramount, which need detail supervision work. Without proper supervision during installation, the IBS in residential projects will not only expose to delay, quality disputes, and design clashes but will also cause misconceptions and coordination problems. The objective of this research is to discover the problems that mostly occur during IBS components installation at site and propose ways to avoid those problems. Besides, the bad effects of the installation problems were also discuss based on the perspective of every stakeholder who involve in IBS residential projects. A questionnaire survey comprising 26 questions was designed in this study to ascertain the challenges/suggestions regarding current practice on IBS installation and its supervision in housing projects. To further validate the collected data, semi-structured interviews were conducted to solicit views from experienced IBS practitioners. The results reveal that the main challenges in supervising to install IBS components are on hardly to find skillful supervision team, supervision additional fees, and IBS components handling. As for solution, most respondents agreed that the IBS installation can be improved by regulating for supervision as mandatory, provide clearer method statement and constant monitoring. At present, most contractors choose to install the IBS components without having supervision as this require fees, and thus many installation facing defects problems. As conclusion, IBS targets for better quality, cost effective and faster completion for Malaysian residential projects is hard to achieve due to lack attention on dissolving the problems involving components installation. 2021 Proceeding PeerReviewed text en http://ir.unimas.my/id/eprint/37231/1/Dr%20Shazwan%20bin%20Mohamed%20Shaari.pdf Ahmad, Abd Jalil and Shazwan, Mohamed Shaari and Nurina, Nawi (2021) IBS in Residential Projects; Dissolving the Problems of On-site Component Installation. In: Asset Management Business Solution International Conference (AMBiS 1.0 2021), 26 & 27 October 2021, Universiti Teknologi Malaysia.
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
topic T Technology (General)
TH Building construction
spellingShingle T Technology (General)
TH Building construction
Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Nurina, Nawi
IBS in Residential Projects; Dissolving the Problems of On-site Component Installation
description Installation the IBS components require detail precision and proper process, if not, the IBS adoption will not bring faster and cheaper cost but instead expose to spending more time for rectification of the defective works. Identifying the difficulties in conducting installation of IBS components is paramount, which need detail supervision work. Without proper supervision during installation, the IBS in residential projects will not only expose to delay, quality disputes, and design clashes but will also cause misconceptions and coordination problems. The objective of this research is to discover the problems that mostly occur during IBS components installation at site and propose ways to avoid those problems. Besides, the bad effects of the installation problems were also discuss based on the perspective of every stakeholder who involve in IBS residential projects. A questionnaire survey comprising 26 questions was designed in this study to ascertain the challenges/suggestions regarding current practice on IBS installation and its supervision in housing projects. To further validate the collected data, semi-structured interviews were conducted to solicit views from experienced IBS practitioners. The results reveal that the main challenges in supervising to install IBS components are on hardly to find skillful supervision team, supervision additional fees, and IBS components handling. As for solution, most respondents agreed that the IBS installation can be improved by regulating for supervision as mandatory, provide clearer method statement and constant monitoring. At present, most contractors choose to install the IBS components without having supervision as this require fees, and thus many installation facing defects problems. As conclusion, IBS targets for better quality, cost effective and faster completion for Malaysian residential projects is hard to achieve due to lack attention on dissolving the problems involving components installation.
format Proceeding
author Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Nurina, Nawi
author_facet Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Nurina, Nawi
author_sort Ahmad, Abd Jalil
title IBS in Residential Projects; Dissolving the Problems of On-site Component Installation
title_short IBS in Residential Projects; Dissolving the Problems of On-site Component Installation
title_full IBS in Residential Projects; Dissolving the Problems of On-site Component Installation
title_fullStr IBS in Residential Projects; Dissolving the Problems of On-site Component Installation
title_full_unstemmed IBS in Residential Projects; Dissolving the Problems of On-site Component Installation
title_sort ibs in residential projects; dissolving the problems of on-site component installation
publishDate 2021
url http://ir.unimas.my/id/eprint/37231/1/Dr%20Shazwan%20bin%20Mohamed%20Shaari.pdf
http://ir.unimas.my/id/eprint/37231/
_version_ 1720440434341183488