Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19

In every Malaysia Plan (now Rancangan Malaysia Ke -12), shortages of housing has been key issue, including in East Malaysia, the state of Sarawak and Sabah. This has been worsened due to pandemic of Covid 19 where many residential projects had to be stopped or conduct with strict SOP due to outbreak...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad, Abd Jalil, Shazwan, Mohamed Shaari, Siti Syariazulfa, Kamaruddin
Format: Proceeding
Language:English
Published: 2021
Subjects:
Online Access:http://ir.unimas.my/id/eprint/37232/1/components1.pdf
http://ir.unimas.my/id/eprint/37232/
https://umevent.um.edu.my/ICIUP2021=b147a61c1d07c1c999560f62add6dbc7
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Sarawak
Language: English
id my.unimas.ir.37232
record_format eprints
spelling my.unimas.ir.372322022-09-19T07:16:24Z http://ir.unimas.my/id/eprint/37232/ Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19 Ahmad, Abd Jalil Shazwan, Mohamed Shaari Siti Syariazulfa, Kamaruddin TH Building construction In every Malaysia Plan (now Rancangan Malaysia Ke -12), shortages of housing has been key issue, including in East Malaysia, the state of Sarawak and Sabah. This has been worsened due to pandemic of Covid 19 where many residential projects had to be stopped or conduct with strict SOP due to outbreak prevention, and government enforcement towards illegal construction foreign workers. Since 1960s, Malaysia had launched many programs to improve better quality for residential and reduce dependency on foreign workers. One of the major steps taken was through the adoption of precast housing within the concept of industrialized building system (IBS). In East Malaysia region, the concept of precast housing had been applied but face many difficulties especially in procuring precast components, and when problems happen such as pandemic outbreak, coupled with scarce of foreign workers, precast housing face heavier burden. Unlike traditional method, precast housing has dissimilar process in term of fabrication, precision of components, installation, and logistics, but many developers treat this concept as similar to traditional construction. This study investigates the hurdles of procuring precast components for residential projects in East Malaysia and suggest solutions to overcome the difficulties. A number of respondents that consist of developers, contractors, IBS pre-casters and consultants had participated. This research use mixed method where the data comes from questionnaires and interviews with the expert. The findings revealed that the obstacles in procuring precast components are mostly on factors of transportation, term of agreement and higher cost and due to these unsolved issues, some pre-casters choose to stop delivery of the components causing delay to the project, while some prolong the disputes to court. This research contributes to the body of knowledge by enlisting the difficulties in procuring precast components and suggesting ways to solve those problems for housing projects in East Malaysia, especially when facing unexpected challenges such as pandemic. 2021 Proceeding PeerReviewed text en http://ir.unimas.my/id/eprint/37232/1/components1.pdf Ahmad, Abd Jalil and Shazwan, Mohamed Shaari and Siti Syariazulfa, Kamaruddin (2021) Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19. In: INTERNATIONAL CONFERENCE ON INTEGRATED URBAN PLANNING 2021 (ICIUP2021), 12 October 2021, University of Malaya, Kuala Lumpur, Malaysia. https://umevent.um.edu.my/ICIUP2021=b147a61c1d07c1c999560f62add6dbc7
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Siti Syariazulfa, Kamaruddin
Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19
description In every Malaysia Plan (now Rancangan Malaysia Ke -12), shortages of housing has been key issue, including in East Malaysia, the state of Sarawak and Sabah. This has been worsened due to pandemic of Covid 19 where many residential projects had to be stopped or conduct with strict SOP due to outbreak prevention, and government enforcement towards illegal construction foreign workers. Since 1960s, Malaysia had launched many programs to improve better quality for residential and reduce dependency on foreign workers. One of the major steps taken was through the adoption of precast housing within the concept of industrialized building system (IBS). In East Malaysia region, the concept of precast housing had been applied but face many difficulties especially in procuring precast components, and when problems happen such as pandemic outbreak, coupled with scarce of foreign workers, precast housing face heavier burden. Unlike traditional method, precast housing has dissimilar process in term of fabrication, precision of components, installation, and logistics, but many developers treat this concept as similar to traditional construction. This study investigates the hurdles of procuring precast components for residential projects in East Malaysia and suggest solutions to overcome the difficulties. A number of respondents that consist of developers, contractors, IBS pre-casters and consultants had participated. This research use mixed method where the data comes from questionnaires and interviews with the expert. The findings revealed that the obstacles in procuring precast components are mostly on factors of transportation, term of agreement and higher cost and due to these unsolved issues, some pre-casters choose to stop delivery of the components causing delay to the project, while some prolong the disputes to court. This research contributes to the body of knowledge by enlisting the difficulties in procuring precast components and suggesting ways to solve those problems for housing projects in East Malaysia, especially when facing unexpected challenges such as pandemic.
format Proceeding
author Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Siti Syariazulfa, Kamaruddin
author_facet Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Siti Syariazulfa, Kamaruddin
author_sort Ahmad, Abd Jalil
title Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19
title_short Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19
title_full Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19
title_fullStr Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19
title_full_unstemmed Procuring Precast Components for Residential Projects in East Malaysia; Hurdles and Solutions during Covid 19
title_sort procuring precast components for residential projects in east malaysia; hurdles and solutions during covid 19
publishDate 2021
url http://ir.unimas.my/id/eprint/37232/1/components1.pdf
http://ir.unimas.my/id/eprint/37232/
https://umevent.um.edu.my/ICIUP2021=b147a61c1d07c1c999560f62add6dbc7
_version_ 1744652129639858176