Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS)

Flood is occurring more frequently in Kuching nowadays due to the impact of climate change and rapid urbanization. The only discharge outlet for Sarawak River Basin currently is at Kuching Barrage and Shiplock. Sarawak State Government had decided to build Matang Bypass Channel from Sarawak River’s...

Full description

Saved in:
Bibliographic Details
Main Authors: Kuok, King Kuok, Chiu, Po Chan, Chin, Mei Yun
Format: Article
Language:English
Published: Scientific Research Publishing Inc. 2021
Subjects:
Online Access:http://ir.unimas.my/id/eprint/46220/1/Sarawak%20River%20Flow.pdf
http://ir.unimas.my/id/eprint/46220/
https://www.scirp.org/journal/paperinformation?paperid=106790
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Malaysia Sarawak
Language: English
id my.unimas.ir.46220
record_format eprints
spelling my.unimas.ir.462202024-10-03T07:32:12Z http://ir.unimas.my/id/eprint/46220/ Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS) Kuok, King Kuok Chiu, Po Chan Chin, Mei Yun QA75 Electronic computers. Computer science Flood is occurring more frequently in Kuching nowadays due to the impact of climate change and rapid urbanization. The only discharge outlet for Sarawak River Basin currently is at Kuching Barrage and Shiplock. Sarawak State Government had decided to build Matang Bypass Channel from Sarawak River’s “Oxbow” to Batang Salak River for mitigating the flooding issues within Sarawak River Basin. Matang Bypass Channel had a bottom width of 250 m, 500 m reserve width and 8 Km in length. Flow behaviour with two discharge outlets during low tides are unknown yet. Therefore, this research is carried out to study Sarawak River flow behaviour after construction of Matang Bypass Channel using InfoWorks River Simulation (RS). Rainfall data used is January 2018. Four scenarios investigated are 1) Open two gates at Matang Bypass Channel opens and all gates at Kuching Barrage, 2) Open all gates at Matang Bypass Channel and Kuching Barrage, 3) Open gates at Matang Bypass Channel, but close all gates at Kuching Barrage, 4) Close all gates at Matang Bypass Channel, but open all gates at Kuching Barrage. Results revealed that when water gates are opened, sea water has the potential to backflow into Sarawak River basin through Kuching Barrage since sea level at Kuching Barrage discharge outlet is always 0.5 m higher than Matang Bypass Channel discharge outlet. When the gates at Matang Bypass Channel are fully opened and Kuching Barrage are closed, Kuching Barrage will retain the excess water and the river water will only be discharged into ocean through Matang Bypass Channel. In contrast, as the gates at Matang Bypass Channel are closed and at Kuching Barrage are fully opened, Matang Bypass Channel will store the excess water and river water will be discharged through Kuching Barrage alone. Scientific Research Publishing Inc. 2021 Article PeerReviewed text en http://ir.unimas.my/id/eprint/46220/1/Sarawak%20River%20Flow.pdf Kuok, King Kuok and Chiu, Po Chan and Chin, Mei Yun (2021) Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS). Journal of Environmental Protection, 12 (1). pp. 36-48. ISSN 2152-2219 https://www.scirp.org/journal/paperinformation?paperid=106790 DOI: 10.4236/jep.2021.121004
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
topic QA75 Electronic computers. Computer science
spellingShingle QA75 Electronic computers. Computer science
Kuok, King Kuok
Chiu, Po Chan
Chin, Mei Yun
Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS)
description Flood is occurring more frequently in Kuching nowadays due to the impact of climate change and rapid urbanization. The only discharge outlet for Sarawak River Basin currently is at Kuching Barrage and Shiplock. Sarawak State Government had decided to build Matang Bypass Channel from Sarawak River’s “Oxbow” to Batang Salak River for mitigating the flooding issues within Sarawak River Basin. Matang Bypass Channel had a bottom width of 250 m, 500 m reserve width and 8 Km in length. Flow behaviour with two discharge outlets during low tides are unknown yet. Therefore, this research is carried out to study Sarawak River flow behaviour after construction of Matang Bypass Channel using InfoWorks River Simulation (RS). Rainfall data used is January 2018. Four scenarios investigated are 1) Open two gates at Matang Bypass Channel opens and all gates at Kuching Barrage, 2) Open all gates at Matang Bypass Channel and Kuching Barrage, 3) Open gates at Matang Bypass Channel, but close all gates at Kuching Barrage, 4) Close all gates at Matang Bypass Channel, but open all gates at Kuching Barrage. Results revealed that when water gates are opened, sea water has the potential to backflow into Sarawak River basin through Kuching Barrage since sea level at Kuching Barrage discharge outlet is always 0.5 m higher than Matang Bypass Channel discharge outlet. When the gates at Matang Bypass Channel are fully opened and Kuching Barrage are closed, Kuching Barrage will retain the excess water and the river water will only be discharged into ocean through Matang Bypass Channel. In contrast, as the gates at Matang Bypass Channel are closed and at Kuching Barrage are fully opened, Matang Bypass Channel will store the excess water and river water will be discharged through Kuching Barrage alone.
format Article
author Kuok, King Kuok
Chiu, Po Chan
Chin, Mei Yun
author_facet Kuok, King Kuok
Chiu, Po Chan
Chin, Mei Yun
author_sort Kuok, King Kuok
title Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS)
title_short Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS)
title_full Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS)
title_fullStr Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS)
title_full_unstemmed Sarawak River Flow Behaviour after Matang Bypass Channel Construction during Low Tide Using InfoWorks River Simulation (RS)
title_sort sarawak river flow behaviour after matang bypass channel construction during low tide using infoworks river simulation (rs)
publisher Scientific Research Publishing Inc.
publishDate 2021
url http://ir.unimas.my/id/eprint/46220/1/Sarawak%20River%20Flow.pdf
http://ir.unimas.my/id/eprint/46220/
https://www.scirp.org/journal/paperinformation?paperid=106790
_version_ 1812131557266161664