Cascade hydroelectric scheme: River flow estimation for reservoir regulation improvement and flood-risk mitigation

Budget control; Control systems; Estimation; Flood control; Floods; Flow measurement; Flow of water; Hydraulics; Hydroelectric power plants; Risk assessment; Risk management; Risk perception; Rivers; Stream flow; Travel time; Water levels; Flood risk management; Flood risks; Historical background; H...

Full description

Saved in:
Bibliographic Details
Main Authors: Jidin R., Othman A.B.
Other Authors: 6508169028
Format: Conference Paper
Published: Institute of Electrical and Electronics Engineers Inc. 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tenaga Nasional