Causes of delay on highway construction project in Klang valley
Construction is a vital industry in all of the countries especially in the developing country such as Malaysia. Moreover, highway construction is very important as it act as a network to connect from one place to another. Delay is a major problem in the construction industry and it is quite challeng...
Saved in:
Main Authors: | , , , , , , , |
---|---|
Other Authors: | |
Format: | Conference Paper |
Published: |
American Institute of Physics Inc.
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tenaga Nasional |
id |
my.uniten.dspace-23582 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-235822023-05-29T14:50:20Z Causes of delay on highway construction project in Klang valley Karunakaran S. Ramli M.Z. Malek M.A. Musir A.A. Imran N.F. Fuad N.F.S.M. Zawawi M.H. Zainal M.Z. 57204943131 57195984780 55636320055 57200119679 57204417667 57200211615 39162217600 57195979188 Construction is a vital industry in all of the countries especially in the developing country such as Malaysia. Moreover, highway construction is very important as it act as a network to connect from one place to another. Delay is a major problem in the construction industry and it is quite challenging to avoid in the construction project. When the project delays, it definitely affects the cost and the quality of the project as well. The main objective of this study is to determine the factors that contributes to the delays in the highway construction project and its significance level towards the respective project. Data collection are gathered based on pilot survey and questionnaire. Then, it followed with the ranking and significance level analysis with the method of Relative Importance Index. Thus, based on the RII ranking, the top five factors was the improper planning, weather, poor site management, poor site investigation and underground utilities. The RII value for the top most and lowest factor was 0.851 and 0.671 respectively. � 2018 Author(s). Final 2023-05-29T06:50:20Z 2023-05-29T06:50:20Z 2018 Conference Paper 10.1063/1.5066883 2-s2.0-85058004350 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85058004350&doi=10.1063%2f1.5066883&partnerID=40&md5=8f1c3222d48a4ec6e227105f9421dfb7 https://irepository.uniten.edu.my/handle/123456789/23582 2030 20242 American Institute of Physics Inc. Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
Construction is a vital industry in all of the countries especially in the developing country such as Malaysia. Moreover, highway construction is very important as it act as a network to connect from one place to another. Delay is a major problem in the construction industry and it is quite challenging to avoid in the construction project. When the project delays, it definitely affects the cost and the quality of the project as well. The main objective of this study is to determine the factors that contributes to the delays in the highway construction project and its significance level towards the respective project. Data collection are gathered based on pilot survey and questionnaire. Then, it followed with the ranking and significance level analysis with the method of Relative Importance Index. Thus, based on the RII ranking, the top five factors was the improper planning, weather, poor site management, poor site investigation and underground utilities. The RII value for the top most and lowest factor was 0.851 and 0.671 respectively. � 2018 Author(s). |
author2 |
57204943131 |
author_facet |
57204943131 Karunakaran S. Ramli M.Z. Malek M.A. Musir A.A. Imran N.F. Fuad N.F.S.M. Zawawi M.H. Zainal M.Z. |
format |
Conference Paper |
author |
Karunakaran S. Ramli M.Z. Malek M.A. Musir A.A. Imran N.F. Fuad N.F.S.M. Zawawi M.H. Zainal M.Z. |
spellingShingle |
Karunakaran S. Ramli M.Z. Malek M.A. Musir A.A. Imran N.F. Fuad N.F.S.M. Zawawi M.H. Zainal M.Z. Causes of delay on highway construction project in Klang valley |
author_sort |
Karunakaran S. |
title |
Causes of delay on highway construction project in Klang valley |
title_short |
Causes of delay on highway construction project in Klang valley |
title_full |
Causes of delay on highway construction project in Klang valley |
title_fullStr |
Causes of delay on highway construction project in Klang valley |
title_full_unstemmed |
Causes of delay on highway construction project in Klang valley |
title_sort |
causes of delay on highway construction project in klang valley |
publisher |
American Institute of Physics Inc. |
publishDate |
2023 |
_version_ |
1806427566725136384 |