An efficiency improvement of flexible flow shop scheduling in automotive part company
Computer software; Machine shop practice; Tabu search; Automotive parts; Earliest due dates; Efficiency improvement; Flexible flow shop; Heuristic solutions; Hybrid tabu search; Scheduling methods; Simulation software; Scheduling
Saved in:
Main Authors: | , , , , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
IOS Press BV
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tenaga Nasional |
id |
my.uniten.dspace-25631 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-256312023-05-29T16:11:59Z An efficiency improvement of flexible flow shop scheduling in automotive part company Fangrit W. Yap H.J. Hamza M.F. Chang S.-W. Yap K.S. Wong S.Y. 57221598080 35319362200 56801415000 55276259900 24448864400 55812054100 Computer software; Machine shop practice; Tabu search; Automotive parts; Earliest due dates; Efficiency improvement; Flexible flow shop; Heuristic solutions; Hybrid tabu search; Scheduling methods; Simulation software; Scheduling Flexible flow shop is becoming more interested and applied in industries due to its impact from higher workloads. Flexible flow shop scheduling problem is focused to minimize the makespan. A metaheuristic model based on Hybrid Tabu Search is developed to overcome this problem. Firstly, Hybrid Tabu Search is modelled based on the factory data. The Earliest Due Date rule is used as the scheduling method for the current status. FlexSim simulation software is used to evaluate the Hybrid Tabu Search model. The outcome is validated with two different basic heuristic solutions; Campbell, Dudek and Smith's and Gupta's heuristics. It is found that the proposed model can improve the job sequence based on makespan criteria. � 2020-IOS Press and the authors. All rights reserved. Final 2023-05-29T08:11:58Z 2023-05-29T08:11:58Z 2020 Article 10.3233/IDT-200006 2-s2.0-85099591413 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85099591413&doi=10.3233%2fIDT-200006&partnerID=40&md5=72a0fdee70daf23cec16d496c0195528 https://irepository.uniten.edu.my/handle/123456789/25631 14 4 493 506 IOS Press BV Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
Computer software; Machine shop practice; Tabu search; Automotive parts; Earliest due dates; Efficiency improvement; Flexible flow shop; Heuristic solutions; Hybrid tabu search; Scheduling methods; Simulation software; Scheduling |
author2 |
57221598080 |
author_facet |
57221598080 Fangrit W. Yap H.J. Hamza M.F. Chang S.-W. Yap K.S. Wong S.Y. |
format |
Article |
author |
Fangrit W. Yap H.J. Hamza M.F. Chang S.-W. Yap K.S. Wong S.Y. |
spellingShingle |
Fangrit W. Yap H.J. Hamza M.F. Chang S.-W. Yap K.S. Wong S.Y. An efficiency improvement of flexible flow shop scheduling in automotive part company |
author_sort |
Fangrit W. |
title |
An efficiency improvement of flexible flow shop scheduling in automotive part company |
title_short |
An efficiency improvement of flexible flow shop scheduling in automotive part company |
title_full |
An efficiency improvement of flexible flow shop scheduling in automotive part company |
title_fullStr |
An efficiency improvement of flexible flow shop scheduling in automotive part company |
title_full_unstemmed |
An efficiency improvement of flexible flow shop scheduling in automotive part company |
title_sort |
efficiency improvement of flexible flow shop scheduling in automotive part company |
publisher |
IOS Press BV |
publishDate |
2023 |
_version_ |
1806425940766490624 |