An efficiency improvement of flexible flow shop scheduling in automotive part company

Computer software; Machine shop practice; Tabu search; Automotive parts; Earliest due dates; Efficiency improvement; Flexible flow shop; Heuristic solutions; Hybrid tabu search; Scheduling methods; Simulation software; Scheduling

Saved in:
Bibliographic Details
Main Authors: Fangrit W., Yap H.J., Hamza M.F., Chang S.-W., Yap K.S., Wong S.Y.
Other Authors: 57221598080
Format: Article
Published: IOS Press BV 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tenaga Nasional
id my.uniten.dspace-25631
record_format dspace
spelling my.uniten.dspace-256312023-05-29T16:11:59Z An efficiency improvement of flexible flow shop scheduling in automotive part company Fangrit W. Yap H.J. Hamza M.F. Chang S.-W. Yap K.S. Wong S.Y. 57221598080 35319362200 56801415000 55276259900 24448864400 55812054100 Computer software; Machine shop practice; Tabu search; Automotive parts; Earliest due dates; Efficiency improvement; Flexible flow shop; Heuristic solutions; Hybrid tabu search; Scheduling methods; Simulation software; Scheduling Flexible flow shop is becoming more interested and applied in industries due to its impact from higher workloads. Flexible flow shop scheduling problem is focused to minimize the makespan. A metaheuristic model based on Hybrid Tabu Search is developed to overcome this problem. Firstly, Hybrid Tabu Search is modelled based on the factory data. The Earliest Due Date rule is used as the scheduling method for the current status. FlexSim simulation software is used to evaluate the Hybrid Tabu Search model. The outcome is validated with two different basic heuristic solutions; Campbell, Dudek and Smith's and Gupta's heuristics. It is found that the proposed model can improve the job sequence based on makespan criteria. � 2020-IOS Press and the authors. All rights reserved. Final 2023-05-29T08:11:58Z 2023-05-29T08:11:58Z 2020 Article 10.3233/IDT-200006 2-s2.0-85099591413 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85099591413&doi=10.3233%2fIDT-200006&partnerID=40&md5=72a0fdee70daf23cec16d496c0195528 https://irepository.uniten.edu.my/handle/123456789/25631 14 4 493 506 IOS Press BV Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Computer software; Machine shop practice; Tabu search; Automotive parts; Earliest due dates; Efficiency improvement; Flexible flow shop; Heuristic solutions; Hybrid tabu search; Scheduling methods; Simulation software; Scheduling
author2 57221598080
author_facet 57221598080
Fangrit W.
Yap H.J.
Hamza M.F.
Chang S.-W.
Yap K.S.
Wong S.Y.
format Article
author Fangrit W.
Yap H.J.
Hamza M.F.
Chang S.-W.
Yap K.S.
Wong S.Y.
spellingShingle Fangrit W.
Yap H.J.
Hamza M.F.
Chang S.-W.
Yap K.S.
Wong S.Y.
An efficiency improvement of flexible flow shop scheduling in automotive part company
author_sort Fangrit W.
title An efficiency improvement of flexible flow shop scheduling in automotive part company
title_short An efficiency improvement of flexible flow shop scheduling in automotive part company
title_full An efficiency improvement of flexible flow shop scheduling in automotive part company
title_fullStr An efficiency improvement of flexible flow shop scheduling in automotive part company
title_full_unstemmed An efficiency improvement of flexible flow shop scheduling in automotive part company
title_sort efficiency improvement of flexible flow shop scheduling in automotive part company
publisher IOS Press BV
publishDate 2023
_version_ 1806425940766490624