Changeover monitoring tool as the measure of time loss in automotive production

Manufacture; Automotive manufacturing; Automotive production; Case-studies; Change-over time; Changeover; Leadtime; Manufacturing companies; Monitoring tools; Non-valued added; Time loss; Productivity

Saved in:
Bibliographic Details
Main Authors: Abdul Rasib A.H., Ebrahim Z., Abdullah R., Mohd Amin A.N., Mohamad Rafaai Z.F.
Other Authors: 57195394283
Format: Conference Paper
Published: Springer Science and Business Media Deutschland GmbH 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tenaga Nasional