Tube failures due to cooling process problem and foreign materials in power plants
Cooling process which uses water for heat transfer is an essential factor in coal-fired and nuclear plants. Loss of cooling upset can force the plants to shut down. In particular, this paper reports visual inspections and metallurgical examinations on the failed SA210-A1 right-hand side (RHS) water...
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2023
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Universiti Tenaga Nasional |
id |
my.uniten.dspace-30738 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-307382023-12-29T15:52:12Z Tube failures due to cooling process problem and foreign materials in power plants Ahmad J. Purbolaksono J. Beng L.C. 57210531371 8621252500 26423491900 Cooling Failure analysis Metallurgy Nuclear power plants Rhodium compounds Tubes (components) Visual communication Coal fired plants Cooling process Ductile rupture Failure mitigation Foreign materials Higher temperatures Metallurgical examination Nuclear plant Outer surface Right-hand sides Root cause of failures Short-term overheating Shut down Thin edge Tube failures Visual inspection Water flows Water wall tubes Plant shutdowns Cooling process which uses water for heat transfer is an essential factor in coal-fired and nuclear plants. Loss of cooling upset can force the plants to shut down. In particular, this paper reports visual inspections and metallurgical examinations on the failed SA210-A1 right-hand side (RHS) water wall tube of a coal-fired plant. The water wall tube showed the abnormal outer surface colour and has failed with wide-open ductile rupture and thin edges indicating typical signs of short-term overheating. Metallurgical examinations confirmed the failed tube experiencing higher temperature operation. Water flow starvation due to restriction inside the upstream tube is identified as the main root cause of failure. The findings are important to take failure mitigation actions in the future operation. Discussion on the typical problems related to the cooling process in nuclear power plants is also presented. � 2010 Elsevier B.V. All rights reserved. Final 2023-12-29T07:52:11Z 2023-12-29T07:52:11Z 2010 Article 10.1016/j.nucengdes.2010.03.022 2-s2.0-77955304966 https://www.scopus.com/inward/record.uri?eid=2-s2.0-77955304966&doi=10.1016%2fj.nucengdes.2010.03.022&partnerID=40&md5=63158939828545cccb2d352fe39b8198 https://irepository.uniten.edu.my/handle/123456789/30738 240 7 1882 1886 Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
topic |
Cooling Failure analysis Metallurgy Nuclear power plants Rhodium compounds Tubes (components) Visual communication Coal fired plants Cooling process Ductile rupture Failure mitigation Foreign materials Higher temperatures Metallurgical examination Nuclear plant Outer surface Right-hand sides Root cause of failures Short-term overheating Shut down Thin edge Tube failures Visual inspection Water flows Water wall tubes Plant shutdowns |
spellingShingle |
Cooling Failure analysis Metallurgy Nuclear power plants Rhodium compounds Tubes (components) Visual communication Coal fired plants Cooling process Ductile rupture Failure mitigation Foreign materials Higher temperatures Metallurgical examination Nuclear plant Outer surface Right-hand sides Root cause of failures Short-term overheating Shut down Thin edge Tube failures Visual inspection Water flows Water wall tubes Plant shutdowns Ahmad J. Purbolaksono J. Beng L.C. Tube failures due to cooling process problem and foreign materials in power plants |
description |
Cooling process which uses water for heat transfer is an essential factor in coal-fired and nuclear plants. Loss of cooling upset can force the plants to shut down. In particular, this paper reports visual inspections and metallurgical examinations on the failed SA210-A1 right-hand side (RHS) water wall tube of a coal-fired plant. The water wall tube showed the abnormal outer surface colour and has failed with wide-open ductile rupture and thin edges indicating typical signs of short-term overheating. Metallurgical examinations confirmed the failed tube experiencing higher temperature operation. Water flow starvation due to restriction inside the upstream tube is identified as the main root cause of failure. The findings are important to take failure mitigation actions in the future operation. Discussion on the typical problems related to the cooling process in nuclear power plants is also presented. � 2010 Elsevier B.V. All rights reserved. |
author2 |
57210531371 |
author_facet |
57210531371 Ahmad J. Purbolaksono J. Beng L.C. |
format |
Article |
author |
Ahmad J. Purbolaksono J. Beng L.C. |
author_sort |
Ahmad J. |
title |
Tube failures due to cooling process problem and foreign materials in power plants |
title_short |
Tube failures due to cooling process problem and foreign materials in power plants |
title_full |
Tube failures due to cooling process problem and foreign materials in power plants |
title_fullStr |
Tube failures due to cooling process problem and foreign materials in power plants |
title_full_unstemmed |
Tube failures due to cooling process problem and foreign materials in power plants |
title_sort |
tube failures due to cooling process problem and foreign materials in power plants |
publishDate |
2023 |
_version_ |
1806425901806649344 |