A simulation approach for dispatching techniques comparison in 200mm wafer foundry

This paper focuses on the comparison of the fundamental techniques for lot dispatching to reveal results for optimum product cycle time. The model is built, based on the 200mm-wafer size, 12K product Work In Progress (WIP), 10 product mixes in the current WIP with 2 new prototype product start daily...

Full description

Saved in:
Bibliographic Details
Main Authors: Chik, M.A., Ahmad, I., Jamaluddin, Md.Y.
Format:
Published: 2017
Online Access:http://dspace.uniten.edu.my:8080/jspui/handle/123456789/5326
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Tenaga Nasional
id my.uniten.dspace-5326
record_format dspace
spelling my.uniten.dspace-53262017-11-15T02:57:32Z A simulation approach for dispatching techniques comparison in 200mm wafer foundry Chik, M.A. Ahmad, I. Jamaluddin, Md.Y. This paper focuses on the comparison of the fundamental techniques for lot dispatching to reveal results for optimum product cycle time. The model is built, based on the 200mm-wafer size, 12K product Work In Progress (WIP), 10 product mixes in the current WIP with 2 new prototype product start daily, for 3K-wafer start per week (WSPW) capacity. The fundamental dispatching rules to be compared are includes First In First Out (FIFO), Shortest Processing Time (SPT), Critical Ratio (CR), Earliest due date (EDD), Shortest Remaining Processing Time (SRPT) and Random (RAN). In the comparison, a snap shot of WIP and product mix were taken at the wafer processing station from pad oxidation cleaning process to alloy. The result then is generated from the commercial simulation software, where requirements such as product cycle time, manufacturing efficiency, equipment availability, product yield and WIP profile are the inputs for the model. The results reveal that CR dispatching rule gives the shortest cycle time for a product to complete all the processes of wafer fabrication by 6% to 13% compared to the other five dispatching rules. Further analyzing for better cycle time, a combination of dispatching rule that consists of CR and SRPT has been tested and yielded 10% additional shorter cycle time compared to CR rule, which make overall improvement to maximum of 23% for overall finding. The result of these finding has been successfully accepted and realization in the real wafer fabrication operation. © 2004 IEEE. 2017-11-15T02:57:32Z 2017-11-15T02:57:32Z 2004 http://dspace.uniten.edu.my:8080/jspui/handle/123456789/5326
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description This paper focuses on the comparison of the fundamental techniques for lot dispatching to reveal results for optimum product cycle time. The model is built, based on the 200mm-wafer size, 12K product Work In Progress (WIP), 10 product mixes in the current WIP with 2 new prototype product start daily, for 3K-wafer start per week (WSPW) capacity. The fundamental dispatching rules to be compared are includes First In First Out (FIFO), Shortest Processing Time (SPT), Critical Ratio (CR), Earliest due date (EDD), Shortest Remaining Processing Time (SRPT) and Random (RAN). In the comparison, a snap shot of WIP and product mix were taken at the wafer processing station from pad oxidation cleaning process to alloy. The result then is generated from the commercial simulation software, where requirements such as product cycle time, manufacturing efficiency, equipment availability, product yield and WIP profile are the inputs for the model. The results reveal that CR dispatching rule gives the shortest cycle time for a product to complete all the processes of wafer fabrication by 6% to 13% compared to the other five dispatching rules. Further analyzing for better cycle time, a combination of dispatching rule that consists of CR and SRPT has been tested and yielded 10% additional shorter cycle time compared to CR rule, which make overall improvement to maximum of 23% for overall finding. The result of these finding has been successfully accepted and realization in the real wafer fabrication operation. © 2004 IEEE.
format
author Chik, M.A.
Ahmad, I.
Jamaluddin, Md.Y.
spellingShingle Chik, M.A.
Ahmad, I.
Jamaluddin, Md.Y.
A simulation approach for dispatching techniques comparison in 200mm wafer foundry
author_facet Chik, M.A.
Ahmad, I.
Jamaluddin, Md.Y.
author_sort Chik, M.A.
title A simulation approach for dispatching techniques comparison in 200mm wafer foundry
title_short A simulation approach for dispatching techniques comparison in 200mm wafer foundry
title_full A simulation approach for dispatching techniques comparison in 200mm wafer foundry
title_fullStr A simulation approach for dispatching techniques comparison in 200mm wafer foundry
title_full_unstemmed A simulation approach for dispatching techniques comparison in 200mm wafer foundry
title_sort simulation approach for dispatching techniques comparison in 200mm wafer foundry
publishDate 2017
url http://dspace.uniten.edu.my:8080/jspui/handle/123456789/5326
_version_ 1644493658303496192