Minimizing makespan of a resource-constrained scheduling problem: a hybrid greedy and genetic algorithms

Resource-Constrained Project Scheduling Problem (RCPSP) is considered as an important project scheduling problem. However, increasing dimensions of a project, whether in number of activities or resource availability, cause unused resources through the planning horizon. Such phenomena may increase ma...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Ariffin, Mohd Khairol Anuar, Baharudin, B. T. Hang Tuah, Leman, Zulkiflle, Delgoshaei, Aidin
Format: Article
Language:English
Published: Growing Science 2015
Online Access:http://psasir.upm.edu.my/id/eprint/45488/1/GENETIC.pdf
http://psasir.upm.edu.my/id/eprint/45488/
http://growingscience.com/beta/ijiec/2016-minimizing-makespan-of-a-resource-constrained-scheduling-problem-a-hybrid-greedy-and-genetic-algorithms.html
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Universiti Putra Malaysia
Language: English